Similar Projects
El Cajon Branch Library
New Construction, Infrastructure
Conception
$30,300,000 est. value
El Cajon, CA 92020

Ac Water Group 1027A - City Of San Diego
Alteration
Conception
$900,000 est. value
San Diego, CA 92101

Costa Verde Commercial Shopping Center Revitalization
Addition, Demolition, New Construction, Renovation, Infrastructure - 360,000 SF
Design
$170,000,000 CJ est. value
San Diego, CA 92122

Mission Basin Groundwater Purification Facility (MBGPF) Well Expansion And Brine Minimization Phase 1 - City of Oceanside
Addition, Infrastructure
Design
$6,000,000 est. value
Oceanside, CA

Construct Bike Path, HMA, Fiber Optic, Landscape, and Electrical
Infrastructure
Bidding
$7,200,000 CJ est. value
San Diego, CA 92101

Design of Otay 2nd Pipeline St Replacement Ph 5
Infrastructure
Post-Bid
$200,000 to $2,500,000 est. value
San Diego, CA 92101

Chilled Water System
Infrastructure
Post-Bid
San Diego, CA

Recycled Air/Vac & Drain Replacement Project
Alteration
Results
$50,000 est. value
Fallbrook, CA 92028

City of Poway Treated Water Facilities and Redundant Pipeline Project
Infrastructure
Results
$1,310,000 est. value
Poway, CA 92064

Oceanside Fire Station #1
Demolition, New Construction, Infrastructure
Construction
$13,579,000 CJ est. value
Oceanside, CA 92054

Nestor Field
Infrastructure
Construction
$122,124 CJ est. value
San Diego, CA 92154

The Trails At Carmel Mountain Ranch
New Construction, Infrastructure
Pending Verification
$450,000,000 CJ est. value
San Diego, CA 92101

Ocean Kamp
New Construction, Infrastructure - 126,400 SF
Pending Verification
$390,000,000 CJ est. value
Oceanside, CA 92054

Carmel Mountain Road Fire Station - San Diego Fire-Rescue Department
New Construction, Infrastructure
Conception
$12,000,000 CJ est. value
San Diego, CA 92129

Albertsons #0071 / Valley Center
New Construction, Infrastructure - 50,907 SF
Design
$8,000,000 CJ est. value
Valley Center, CA 92082

Last Updated 02/10/2023 06:47 AM
Project Title

Otay Water Treatment Plant Basin #1 Concrete Restoration

Physical Address View project details and contacts
City, State (County) Chula Vista, CA 91915   (San Diego County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $1,245,625 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project No. / WBS No.: B-17092.02.06 The concrete restoration of flocculation and sedimentation in basin no. 1 shall include but not limited to surface reparation, concrete repairs, joint strips replacement, resurfacing, and application of protective coating on the floors and walls at flocculation and sedimentation basin I to include all carbon steel surfaces in the basin (Mixers Excluded), and shall include replacement of redwood baffles and cathodic protection of metal parts within the basin per requirements of specification and these plans. 1.1 The Work shall be performed in accordance with: 1.1.1. The Notice Inviting Bids and Plans numbered 40352-01-D thru 40352-08-D, inclusive. Contractor and Subcontractor Registration Requirements. This project is subject to compliance monitoring and enforcement by the DIR. A contractor or subcontractor shall not be qualified to bid on, be listed in a bid or proposal, subject to the requirements of section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, unless currently registered and qualified to perform public work pursuant to Labor Code section 1725.5 It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded. 1.9.1. A Contractor's inadvertent error in listing a subcontractor who is not registered pursuant to Labor Code section 1725.5 in response to a solicitation shall not be grounds for filing a bid protest or grounds for considering the bid non-responsive provided that any of the following apply: (1) the subcontractor is registered prior to bid opening; (2) within twenty-four hours after the bid opening, the subcontractor is registered and has paid the penalty registration fee specified in Labor Code section 1725.5; or (3) the subcontractor is replaced by another registered subcontractor pursuant to Public Contract Code section 4107. 1.9.2. By submitting a bid or proposal to the City, Contractor is certifying that he or she has verified that all subcontractors used on this public work project are registered with the DIR in compliance with Labor Code sections 1771.1 and 1725.5, and Contractor shall provide proof of registration for themselves and all listed subcontractors to the City at the time of bid or proposal due date or upon request. Bid Valid 120 Calendar Days Liquidated Damages $1000.00 per Day Project Duration 200 Working Days Online Q&A No SUBCONTRACTING PARTICIPATION PERCENTAGES: Subcontracting participation percentages apply to this contract. 7.1. The City has incorporated mandatory SLBE-ELBE subcontractor participation percentages to enhance competition and maximize subcontracting opportunities. For the purpose of achieving the mandatory subcontractor participation percentages, a recommended breakdown of the SLBE and ELBE subcontractor participation percentages based upon certified SLBE, and ELBE firms has also been provided to achieve the mandatory subcontractor participation percentages: 1. SLBE participation 7.5% 2. ELBE participation 10.9% 3. Total mandatory participation 18.4% 7.2. The Bid may be declared non-responsive if the Bidder fails to meet the following requirements: 7.2.1. Include SLBE-ELBE certified subcontractors at the overall mandatory participation percentage identified in this document, or 7.2.2. Submit Good Faith Effort (GFE) documentation, saved in searchable Portable Document Format (PDF), demonstrating the Bidder made a good faith effort to conduct outreach to and include SLBE-ELBE Subcontractors as required in this solicitation by 5 PM 3 Working Days after the Bid opening if the overall mandatory participation percentage is not met. This Contract Will Be Subject to the Following: *the City's Subcontracting Participation Requirements for Slbe Program * Prevailing Wage Rates: State * Apprenticeship * Two Tier Prequalification February 3, 2022 Phase II Prequal Deadline January 20, 2022 Phase I Prequal Deadline

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents