Similar Projects
Replace Guardrails and Handrails, Biscayne NP
Post-Bid
$100,000 to $250,000 est. value
Homestead, FL

Miami-Dade College Kendall Campus Deferred Maintenance Building 2000 Exterior Waterproofing Project
Post-Bid
Kendall, FL

Hurricane Irma - Zoo Miami Canopy Shade Repair
Results
Less than $309,225 est. value
Miami, FL 33177

57 Units Villa Aida - Exterior Painting and Waterproofing
Results
Less than $75,000 est. value
Hialeah, FL

Elderly Housing Projects - Exterior Painting and Waterproofing
Post-Bid
Hialeah, FL 33010

Furnish and Replace Playground Canopies
Results
FL

Replace Blue Canopy at Coast Guard Civil Engineering Unit Richmond Heights FL.
Post-Bid
Richmond Heights, FL

PHCD REAC 2018 - Annie Coleman 5-14
Results
Less than $99,000 est. value
Miami, FL

PHCD REAC 2018 - Annie Coleman 5-14 / Contract 4
Results
Less than $99,300 est. value
Miami, FL

PHCD REAC 2018 - Annie Coleman 5-14 / Contract 2
Results
Less than $99,100 est. value
Miami, FL

PHCD REAC 2018 - Annie Coleman 5-14 / Contract 3
Results
Less than $99,200 est. value
Miami, FL

PHCD REAC 2018
Results
Less than $95,000 est. value
Miami, FL

PHCD REAC 2018 - Exterior Work at Various Sites / Tier 1 / Arthur Mays / Goulds Plaza / South Ridge 1 and 2
Results
Less than $85,000 est. value
Miami, FL

PHCD REAC 2018
Results
Less than $89,500 est. value
Miami, FL

PHCD REAC 2018 Exterior Site Improvements
Results
Less than $88,900 est. value
Miami, FL

Last Updated 12/11/2018 03:57 PM
Project Title

Roof Perimeter Guardrail Installation at Holland Hall

Physical Address View project details and contacts
City, State (County) Hialeah, FL 33010   (Miami-Dade County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description - Contractor shall provide and install a new guardrail protection system as existing to entire roof perimeter. - Guardrail system must match exactly (100%) existing ones at roof area including design and color. - Guardrail system shall be not less than 42" high when measured vertically. - New Guardrail system shall resist a linear load of 50 pounds per linear foot and a concentrated load of 200 pounds. - Contractor is responsible for repairing, painting any area affected by the work to match existing.
Details
Division 09 - Finishes.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents