Similar Projects
Building Renovations and Sanitary Sewer Upgrades at Seasonal Housing Facility
Renovation, Alteration - 12,000 SF
Design
Nantucket, MA

Assabet Well No 3 Connection - General Bids
Infrastructure
Bidding
$950,000 est. value
Acton, MA

Installation of an Automatic Pumping System
Infrastructure
Bidding
$70,000 est. value
Lynn, MA 01904

Well No. 3 Upgrades - General Bids
Post-Bid
Less than $750,000 est. value
Littleton, MA

Backwash Pump VFD Project
Post-Bid
Walpole, MA 02081

GP 1 Replacement Well Implementation - General Bids
Results
$350,000 est. value
Seekonk, MA

Decommissioning of a Former Water Well
Results
$15,000 to $25,000 est. value
Huntington, MA

Well Station 4 Improvements
Infrastructure
Bidding
Oak Bluffs, MA

Dewatering Pump Restoration and Maintenance Service, Diesel Powered
Post-Bid
Charlestown, MA

Construction of Two Gravel-Packed Wells for Municipal Water Supply, and Decommissioning of Four Municipal Wells
Results
$475,000 est. value
South Dartmouth, MA 02748

Well Station 4 Booster Pump System
Infrastructure
Bidding
Sharon, MA 02067

Well Cleaning 2 and 8 Redevelopment
Post-Bid
Sudbury, MA

Wet Well Cleaning
Term Contract
Results
Stoughton, MA

Water Department Garage Heaters Venting Replacement and Water Treatment Office Heater Installation Project
Infrastructure, Alteration
Bidding
$35,000 est. value
Brewster, MA

Municipal Drinking Water Well Cleaning and Rehabilitation
Term Contract
Post-Bid
Less than $200,000 est. value
Canton, MA

Reported 12/09/2021 11:44 AM
Project Title

Cuttyhunk Island Wellfield Replacement

Physical Address View project details and contacts
City, State (County) Gosnold, MA   (Dukes County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status No Responses Submitted
Bids Due View project details and contacts
Estimated Value $350,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents