Similar Projects
Airline - Lambert Well No. 2
Infrastructure
Bidding
$650,000 est. value
Marana, AZ 85653

Repair Well 15 at Davis-Monthan AFB
Infrastructure
Bidding
$250,000 to $500,000 est. value
Tucson, AZ

Navajo Nation Western Navajo Pipeline Phase 1 - Bodaway-Gap Well Project
Post-Bid
Fort Defiance, AZ 86504

WAPA DSW: Oil/Water Separator and Sewer Lift Preventative Maintenance
Post-Bid
Phoenix, AZ

Carrizo Production Wells
Results
$100,000 to $250,000 est. value
Fort Apache, AZ

Water/Wastewater Pumps
Results
Mesa, AZ 85203

Well Maintenance
Term Contract
Post-Bid
AZ

Industrial Water Well Systems - Inspection, Testing, Maintenance, and Repair Services for Specified ADCRR Facilities
Results
Phoenix, AZ 85007

Materials and Equipment for Well 21 Repair
Term Contract
Post-Bid
Luke Air Force Base, Peoria, AZ 85309

Gvid Well 3 Replacement
Results
$475,000 est. value
Golden Valley, AZ 86413

Drilling Well 5
Term Contract, Infrastructure
Post-Bid
Florence, AZ

Pump Maintenance, Repair and Purchase - As Needed (Western Region State Parks)
Results
Phoenix, AZ 85085

Gilson Wash West Well Phase 2
Alteration
Post-Bid
San Carlos, AZ

Irrigation Pump Maintenance
Term Contract
Results
$25,000 est. value
Scottsdale, AZ

Construction Project Drilling and Installation of the Pulte Rio Caballo Well No.1
Infrastructure
Post-Bid
Surprise, AZ 85387

Reported 05/19/2022 12:00 AM
Project Title

Lift Station 16-2 Wet Well Rehabilitation

Physical Address View project details and contacts
City, State (County) Bullhead City, AZ 86442   (Mohave County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $45,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project proposes the Rehabilitation of both Lift Station 16 - 2’s wet wells and miscellaneous improvements to the suction and discharge piping.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents