Similar Projects
East Central High School Arena and Auxiliary Gym Project Finishes and YMCA Buildout
Alteration
Post-Bid
Tulsa, OK 74128

Union Public Schools High School Water Damage Repair Phase 1
Renovation
Post-Bid
Tulsa, OK 74146

Phase 3- General Construction Remodel
Renovation
Results
Sand Springs, OK

CPHS PE Gym Remodel- General Construction and Wood Floor
Renovation
Results
Sand Springs, OK 74063

The Learning Experience
New Construction
Construction
Broken Arrow, OK 74012

South Elementary School
New Construction, Addition
Pending Verification
Tulsa, OK 74107

North Elementary School
Renovation
Pending Verification
Bixby, OK 74008

Interior Construction Remodel
Renovation
Post-Bid
Sand Springs, OK

Innovation Lab Phase II
Renovation - 13,000 SF
Results
$2,540,917 est. value
Tulsa, OK 74133

Berryhill High School
Renovation, Addition
Pending Verification
Tulsa, OK 74107

Upper Elementary and Early Childhood Center Additions
Addition
Post-Bid
Collinsville, OK 74021

New Greenhouse/Hoop House - Union Public Schools
New Construction
Results
$207,446 est. value
Tulsa, OK 74146

Cafeteria Improvements at Edison Preparatory
Renovation
Post-Bid
$2,500,000 est. value
Tulsa, OK

District Wide Building-Automation Systems Upgrades
Renovation
Results
$300,000 est. value
Tulsa, OK 74103

Broken Arrow Public Schools Event Center
Renovation - 114,000 SF
Post-Bid
$61,000,000 est. value
Broken Arrow, OK 74012

Last Updated 08/29/2022 12:27 PM
Project Title

Proposition 4 - Tulsa Public Schools

Physical Address View project details and contacts
City, State (County) Tulsa, OK 74103   (Tulsa County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $90,695,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

On June 8, 2021, Tulsans approved the 2021 Bond for Tulsa Public Schools As of August 29, 2022 a design team has not been obtained. Proposition 4 would authorize the district to spend $139.3 million on learning materials and programs by spending $29.9 million to purchase textbooks and learning materials, $19.9 million to increase postsecondary career education programs and expand access to early childhood education programs, and $11.5 million to support STEM program and lab upgrades. Information regarding design firm and general contractor selection or method of selection has not been disclosed. The firm construction timeline has not been released. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents