Similar Projects
Downtown Stormwater Treatment Phase 4 - STRH02 - City of Bozeman
Renovation
Conception
$250,000 CJ est. value
Bozeman, MT 59715

Downtown Stormwater Treatment Phase 3 - STRH01 - City of Bozeman
Renovation
Conception
$300,000 CJ est. value
Bozeman, MT 59715

Town of Wibaux Wastewater Treatment System Upgrades Project
New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Wibaux, MT 59353

North Havre CWD Water System Improvements
New Construction, Infrastructure
Bidding
$700,000 CJ est. value
Havre, MT 59501

BMP Pipe Maintenance Construction Project
Renovation, Alteration
Post-Bid
MT 59901

Water Treatment Plant High Service Pump Station HVAC Upgrades
Renovation
Post-Bid
$200,000 CJ est. value
Billings, MT 59101

Water Reclamation Facility Heat Exchangers
Renovation
Results
Billings, MT

Water Reclamation Facility Primary Digester Cleaning and Improvements
Renovation
Results
Billings, MT

Great Falls Water Treatment Plant Solids Mitigation Improvements Project
Renovation
Pending Verification
$300,000 CJ est. value
Great Falls, MT 59401

Mechanical Separation Units - Downtown Stormwater Treatment Phase 2 - STRM39 - City of Bozeman
Renovation
Conception
$300,000 CJ est. value
Bozeman, MT 59715

Town of Terry Wastewater Treatment System Upgrades
Renovation
Post-Bid
$5,782,954 CJ est. value
Terry, MT 59349

Buena Vista Community Phase 2 Wastewater System Improvements
Renovation
Results
$580,000 est. value
Missoula, MT

Resurface and Repaint Clarifiers - WW39 - City of Bozeman
Renovation
Conception
$320,000 CJ est. value
Bozeman, MT 59718

Simms Wastewater Treatment System Improvements - Phase II
Infrastructure, Renovation
Post-Bid
$330,000 CJ est. value
Simms, MT 59477

Wilsall Water District Water System Improvements
New Construction, Renovation, Infrastructure
Results
$4,280,000 CJ est. value
Wilsall, MT 59086

Last Updated 11/09/2022 10:05 AM
Project Title

Waste Water Treatment Plant Clarifier Rehabilitation

Physical Address View project details and contacts
City, State (County) Great Falls, MT 59401   (Cascade County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $4,435,400 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 26th, 2022, project has not been awarded yet. It is expected to be awarded sometime after 2nd week of November. The engineers construction estimate is $2.25M for the base bid, $4.8M including all alternates. Rehabilitation and improvements associated with the clarifiers in the WWTP. Project work consists of the following: complete removal and improvements to the designated Secondary Clarifiers will be completed, such as standpipe and mechanism replacement, effluent launder replacement, concrete surface restoration and coatings, and replacement and addition of controls equipment. The Owner may choose to select or deny any of the designated alternates. Contractor and Any of the Contractors Subcontractors Doing Work on This Project Will Be Required to Obtain Registration With the Montana Department of Labor and Industry (Dli). Forms for Registration Are Available From the Department of Labor and Industry, P.o. Box 8011, 1805 Prospect, Helena, Montana 59604-8011. Information on Registration Can Be Obtained by Calling 1-406-444-7734. Contractor is Not Required to Have Registered With the Dli Prior to Bidding on This Project, but Must Have Registered Prior to Execution of the Construction Agreement. All Laborers and Mechanics Employed by the Contractor or Subcontractors in Performance of the Construction Work Shall Be Paid Wages at Rates as May Be Required by the Laws of the City of Great Falls and the State of Montana. The Contractor Must Ensure That Employees and Applicants for Employment Are Not Discriminated Against Because of Their Race, Color, Religion, Sex or National Origin. Each Bid or Proposal Must Be Accompanied by a Certified Check, Cashiers Check, or Bid Bond Payable to City of Great Falls, in an Amount Not Less Than Ten Percent (10%) of the Total Amount of the Bid. Successful Bidders Shall Furnish an Approved Performance Bond and Labor and Materials Payment Bond, Each in the Amount of One Hundred Percent (100%) of the Contract Amount. Insurance, as Required, Shall Be Provided by the Successful Bidder(S) and a Certificate(S) of That Insurance Shall Be Provided. Contactor and All Subcontractors Must Be Licensed to Perform Work in the City of Great Falls. The Right is Reserved to Reject Any or All Proposals Received, to Waive Informalities, to Postpone the Award of the Contract for a Period Not to Exceed Sixty (60) Days, and to Accept the Lowest Responsive and Responsible Bid Which is in the Best Interest of the Owner. The City of Great Falls is an Equal Opportunity Employer. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents