Similar Projects
East Selmon Expressway Slip Ramps Design-Build
Bidding
Tampa, FL

Douglas Avenue Crosswalk
Bidding
Dunedin, FL 34698

Widen/Resurface Exist Lanes/Sidewalk/Bicycle Lanes
Post-Bid
Less than $1,378,994 est. value
FL

Harvest Center Sidewalk Improvements
Post-Bid
Homestead, FL

Sidewalk Restoration Services
Term Contract
Results
Miramar, FL

Six Mile Cypress Shared use Path from Winkler Avenue to Challenger Boulevard
Results
Less than $145,666 est. value
Fort Myers, FL 33901

Bypass Drive Improvements
Bidding
$1,500,000 est. value
Clearwater, FL 33764

Douglas Bldg. ADA Upgrades- Parking
Post-Bid
Tallahassee, FL 32399

Parking Lot Resealing at Trails and Tails Park and Veterans Park
Results
Less than $22,000 est. value
Doral, FL 33178

Street Resurfacing and Miscellaneous Roadway Improvements
Term Contract
Bidding
$650,000 est. value
Jupiter, FL

Public Private Partnership Redevelopment Opportunity for the Hollywood Beach Culture and Community Center
New Construction - 20,000 SF
Post-Bid
Hollywood, FL 33019

Myrtle Street Improvements, Phase 3
Results
Less than $2,536,473 est. value
Sarasota, FL 34234

Goodwin Street Pedestrian and Drainage Improvements
Bidding
Bonita Springs, FL

Annual Concrete Sidewalk, Driveway, Curb, and Gutter Repairs
Term Contract
Post-Bid
Fort Myers, FL 33901

Oars and Paddles Park, Parking Lot Expansion
Results
Indian Harbour Beach, FL 32937

Last Updated 02/10/2021 02:16 AM
Project Title

Oleander Avenue Sidewalk from Midway Road to South Market Avenue

Physical Address View project details and contacts
City, State (County) Fort Pierce, FL 34945   (Saint Lucie County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope consists of: 1. Construction of a 6-foot wide sidewalk. 2. Harmonization of the existing drainage with the new sidewalk. 3. Installation of fiber optic conduit and pull boxes. 4. Installation of appurtenances including, but not limited to, pavement markings, detectable warning surfaces, clearing and grubbing, and related BMP for erosion and stormwater control.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents