Similar Projects
Metro Business and Space Center
New Construction, Infrastructure - 112,258 SF
Conception
$12,100,000 CJ est. value
Rogers, AR 72758

B Street Townhomes
New Construction - 14,445 SF
Conception
Bentonville, AR 72712

Poigai Estates Subdivision
New Construction
Design
Bentonville, AR

Ninth Street Townhomes
New Construction - 1,047,200 SF
Design
$10,000,000 CJ est. value
Rogers, AR 72758

Lake Francis Street Rebuild
Infrastructure
Bidding
$1,800,000 CJ est. value
Siloam Springs, AR 72761

South Dixieland Road Extension
Infrastructure
Bidding
$500,000 CJ est. value
Lowell, AR 72745

Construction of AWIN Tower Site Work Designs
Infrastructure
Post-Bid
Little Flock, AR

Caliber Collision / Bentonville
New Construction, Infrastructure - 16,345 SF
Post-Bid
$2,500,000 CJ est. value
Bentonville, AR 72712

McReynolds Recreational Vehicle Park
New Construction
Construction
Siloam Springs, AR 72761

Starbucks / Bentonville
New Construction, Infrastructure - 1,921 SF
Construction
$800,000 CJ est. value
Bentonville, AR 72712

Pinnacle Villas
New Construction, Demolition
Pending Verification
Bentonville, AR 72712

Orchard Multi-Family
New Construction
Pending Verification
Bentonville, AR

Metro Business and Space Center
New Construction, Infrastructure - 112,258 SF
Conception
$12,100,000 CJ est. value
Rogers, AR 72758

Fox Meadow Subdivision
New Construction - 35,000 SF
Design
Siloam Springs, AR

Water Tower Road; Phase 2
Infrastructure
Bidding
$3,000,000 CJ est. value
Bentonville, AR 72712

Last Updated 10/19/2022 02:01 PM
Project Title

SW 4th and B Street Townhomes

Physical Address View project details and contacts
City, State (County) Bentonville, AR 72712   (Benton County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Multi-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected August 2021
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 19, 2022, this project is under construction. An architect has been selected and the developer is the general contractor. The construction has commenced as of August 2021.

Details

10,451 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents