Similar Projects
Last Updated | 08/24/2022 11:10 AM |
Project Title | Rate of Flow Controllers Procurement Sturgeon Point Water Treatment Plant Filtration Piping, Valve, and Underdrain System Improvements Ecwa |
Physical Address | View project details and contacts |
City, State (County) | Derby, NY 14047 (Erie County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The contract consists of furnishing Goods and Special Services associated with the valves and actuators. Installation of the Goods is not part of this Contract. Procurement Contract with Seller for the procurement of Goods and Special Services for MP-090-P07, rate of flow controllers Procurement, Sturgeon Point Water Treatment Plant, Filtration Piping Valve, and Underdrain System Improvements. The Goods to be provided through the Procurement Contract shall be furnished and delivered to the Point of Destination for installation by Contractor. Owner will assign said Procurement Contract to Contractor as set forth in the Procurement Agreement. Contractor will accept the assignment, as Buyer (Contractor/Assignee), and will be responsible to Owner for the performance of obligations by Seller, which will become a Subcontractor or Supplier to Contractor. Each Bid shall be accompanied by a certified check or bid bond in the amount of five percent (5%) of the amount of the Bid. In accordance with State Finance Law 139-j and 139-k, all questions about meaning or intent of the bidding documents shall be submitted to the designated contact person in writing. The designated contact is Tim Shafer, ARCADIS, 50 Fountain Plaza, Suite 600, Buffalo, NY 14202, telephone 716-667-6666, email Tim.Shafer@arcadis.com. The Erie County Water Authority reserves the right to reject any and all Bids or to accept any Bid deemed to be for the best interest of the Erie County Water Authority even though the Bid chosen may result in the award of the Procurement Contract to a Bidder whose Bid is not mathematically lowest. |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |