Similar Projects
Lakeville Nursery Redevelopment
New Construction - 37,000 SF
Conception
Lakeville, MA 02347

Aegis Energy
Renovation - 40,000 SF
Conception
$70,000,000 est. value
Holyoke, MA 01040

Ashland Avenue Industrial Re-development
New Construction, Demolition - 29,250 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Southbridge, MA 01150

Oberon Manufacturing
Renovation - 60,000 SF
Design
Dartmouth, MA

241 Duchaine Boulevard Disposition and Development
Results
$225,000 est. value
New Bedford, MA 02740

Alnylam Pharmaceuticals
New Construction - 200,000 SF
Construction
$200,000,000 est. value
Norton, MA 02766

Tree House Brewery
Addition - 3,600 SF
Construction
Charlton, MA 01507

Marijuana Cultivation Facility
Renovation, Addition - 2,000 SF
Pending Verification
Millis, MA

Cannabis Manufacturing Facility
Renovation
Pending Verification
Millis, MA

Carpenters Shop Addition
Renovation, Addition
Conception
Sommerville, MA 02143

Camger Coating Systems
New Construction - 20,000 SF
Design
Norfolk, MA 02056

Worcester County Welding Addition
Addition - 8,100 SF
Construction
Leicester, MA 01542

Wuxi Biologics
New Construction - 110,000 SF
Pending Verification
$60,000,000 est. value
Worcester, MA 01604

Distribution / Warehouse
New Construction - 1,408,840 SF
Conception
$10,000,000 CJ est. value
Charlton, MA

Commercial Condo Cannabis Complex
New Construction - 16,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
West Boylston, MA

Last Updated 05/06/2020 11:29 AM
Project Title

Concord Road Industrial Building

Physical Address View project details and contacts
City, State (County) Billerica, MA 01821   (Middlesex County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant
Contracting Method
Project Status Construction Commenced September 2019, Construction Complete as of December 2019, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value $141,217
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Manufacturing/Processing Plant, 1 Story Above Grade, 45,000 SF Addition.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents