Similar Projects
115 kV - 24.94/14.4 kV Substation Switching Facilities
Post-Bid
Statesville, NC

Ground Power Units
Post-Bid
Charlotte, NC

34.5-12.47/7.2 kV Substation Switching Facilities and Accessories
Results
Washington, NC

Generator Service Contract
Term Contract
Results
Less than $22,944 est. value
Angier, Cameron, Fuquay-Varina, Lillington, NC 27546

Power to Varsity Research Building
Post-Bid
Less than $1,500,000 est. value
Raleigh, NC

Residential Electrical Services
Results
Concord, NC

BWGP Breaker Change Out Project
Post-Bid
Fayetteville, NC 28302

Detention Center Switchgear Upgrades
Results
Less than $275,842 est. value
Castle Hayne, NC 28429

NC A and T Carver Hall Generator Addition
Post-Bid
Greensboro, NC 27411

EOC/911 Center Generator Repair
Results
Wilmington, NC 28403

DPS - ABC Commission - Warehouse Building Power Improvements
Post-Bid
Raleigh, NC 27610

Substation Indoor Switchboard
Results
Laurinburg, NC

Repair Hydraulic Test Bench & Electrical Upgrade, AS518 & T12 (Proj. 16-0028)
Post-Bid
$500,000 to $1,000,000 est. value
Camp Lejeune, NC 28547

Moore Square Parking Deck Lighting Upgrades
Results
Raleigh, NC

Building 2000 Lighting Replacement
Post-Bid
Concord, NC 28027

Last Updated 07/21/2021 10:04 AM
Project Title

UNC-CH Paul Green Theatre Grid

Physical Address View project details and contacts
City, State (County) Chapel Hill, NC   (Orange County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of a lightweight removable panelized grid surface (Wire Grid) that will replace an existing grating system that currently presents fall hazards for personnel. The grid shall be a specialty performance system specifically intended for technical personnel access, and constructed such that performance lighting may shine through the walking surface without noticeable shadowing or obstructions on surfaces below. The grid system shall include: • A series of nominal 4’ x 4’ removable panels constructed to be supported from the building’s existing support structure. • Lighting pipes per the drawings • Lighting pipe supports on existing grid support hangers. • Additional pipe hangers to support lighting pipes • New code compliant toe kicks at grid perimeter • All other equipment and accessories to provide a complete system

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents