Similar Projects
Charging Station
Addition
Conception
Lebanon, NJ 08833

Railroad Avenue Residences
New Construction - 111,333 SF
Design
$10,000,000 CJ est. value
Harrison, NJ 07029

Tuff Shed Store
New Construction, Renovation
Design
Clifton, NJ 07014

Market Street Bus Garage Rehabilitation Project
Addition - 3,232 SF
Bidding
Paterson, NJ

Construction Management Services for the Market Street Bus Garage Rehabilitation Project
Bidding
Newark, NJ 07105

Carvana Auto Sales Center and Car Tower
New Construction, Demolition - 5,790 SF
Sub-Bidding
Fort Lee, NJ 07024

Construction, Installation and Maintenance of Bus Shelters within the Township of Cherry Hill
Post-Bid
Cherry Hill, NJ

Add/Alter/Repair Vehicle Maintenance Facility 3325
Results
$1,000,000 to $5,000,000 est. value
Trenton, NJ 08641

Exchange Place and Newport Station Head Houses Permanent Flood Protection
Results
$20,000,000 to $30,000,000 est. value
Jersey City, NJ 07097

32nd Street Mixed-Use Development
New Construction, Demolition - 28,852 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Union City, NJ 07087

Gas N Go Kiosk and Canopy
New Construction - 205 SF
Pending Verification
Newton, NJ 07860

Preakness Shopping Center
New Construction, Demolition
Design
Wayne, NJ 07470

Park and Ride Facility at Garden State Parkway Interchange 58 And C.R. 539, Little Egg Harbor Township
Results
Less than $1,000,000 est. value
NJ

Manchester Transportation Garage
New Construction - 27,400 SF
Results
Manchester Township, NJ

Clifton DPW Vehicle Storage Facility Oil Water Separator Installation
Results
Clifton, NJ 07013

Reported 09/18/2019 12:00 AM
Project Title

Electric Vehicles Charging Infrastructure at Various PortAuthority Facilities

Physical Address View project details and contacts
City, State (County) Bayonne, Elizabeth, Hoboken, Jersey City, Newark, NJ - New York, Yonkers, NY (Essex, Hudson, Union (NJ) - New York, Westchester (NY) Counties)
Category(s) Transportation
Sub-Category(s) Misc. Structures
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description The Port Authority seeks information for Electric Vehicle (“EV”) Charging infrastructure and services (“EV Charging”) at various Port Authority facilities that would support up to 1,500 Port Authority owned vehicles and potentially public usage from airport passengers and commuters. To this end, we are seeking responses to this RFI from firms interested in a prospective EV Charging solution with the Port Authority via various business models (“Respondents”). Respondents should take this opportunity to share with us their experience, insights, ideas and preferred approach to siting, installing, financing, operating, maintaining, and planning EV Charging infrastructure and services over the next five years.
Details
Division 03 - Concrete, Cast-in-Place Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Protective Covers, Transportation Stop Shelters.
Division 12 - Furnishings, Multiple Seating, Pews and Benches, Benches.
Division 26 - Electrical, Battery Equipment, Battery Chargers, Lighting.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks.
Division 33 - Utilities, Storm Drainage Utilities.
Division 48 - Electrical Power Generation, Electrical Power Control Equipment, Electrical Power Generation Battery Charging Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents