Similar Projects
Shake Shack / Des Peres
New Construction, Infrastructure - 3,453 SF
Design
$1,000,000 CJ est. value
Des Peres, MO 63131

2022 and 2023 Citywide Sidewalk
Post-Bid
$969,502 est. value
Saint Louis, MO

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

Spanish Pond ADA Improvements
New Construction
Results
MO 63138

Repave Streetscape at Justice Center
Results
Ballwin, MO 63011

Installation of a Walking Track
Infrastructure
Post-Bid
Overland, MO

McGrath Elementary School and ECC Sitework Package
Results
Brentwood, MO 63144

Parking Lot Rehabilitation
Infrastructure
Post-Bid
Chesterfield, MO 63005

Asphalt Overlay Improvements
Results
University City, MO

Saint Vincent Greenway: Trojan Park to Robert L. Powell Place
New Construction, Infrastructure
Post-Bid
Saint Louis, MO 63133

Kirkwood School District Paving Maintenance Projects 2021
Term Contract
Results
Kirkwood, Saint Louis, MO 63122

Rehabilitation of Abandoned Property
Renovation, Infrastructure
Post-Bid
Ferguson, MO

2021 Concrete Pavement Replacement
Infrastructure
Results
Bridgeton, MO 63044

Property Redevelopment
Infrastructure
Post-Bid
Saint Louis, MO 63121

2020 CRS Pavement Rehabilitation
Infrastructure
Results
MO

Last Updated 11/10/2022 04:05 PM
Project Title

McKelvey Road Resurfacing - Phase II

Physical Address View project details and contacts
City, State (County) Maryland Heights, MO 63043   (Saint Louis County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $3,084,651 [brand] Estimate
Plans Available from Copy Center - 10/03/22
Owner View project details and contacts
Architect View project details and contacts
Description

St. Louis County Project No. AR-1718, Federal Project No. STP-5558(610), consists of the removal and replacement of deteriorated and/or damaged pavement, pavement surfacing and texturing, Superpave asphaltic concrete overlay, removal and replacement of sidewalk curb ramps, construction of new curbs, sidewalks, and retaining walls, construction of new storm sewers, replacement of guardrail, installation of traffic signal equipment, and other incidental items on McKelvey Road from Glenpark Drive to Creve Coeur Mill Road within St. Louis County. Contractors and sub-contractors who sign a contract to work on a public works project shall provide a ten (10) hour OSHA construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work on the construction project. St. Louis County hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award. All questions must be submitted by 5:00 p.m. on November 2, 2022 via e-mail to the Contract Administrator, Shandrika Combs, SCombs@stlouiscountymo.gov. Bids must be accompanied by a certified check or bidder's bond in an amount equal to 5% of the total bid. All checks shall be made payable to "Treasurer, St. Louis County." The right is reserved by the St. Louis County to reject any or all bids. The DBE Goal for this project is 16% No 2nd tier subcontracting will be allowed on this project. 6834F-19

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents