Similar Projects
Roof Replacement - Buchanan County Courthouse
Renovation
Sub-Bidding
$300,000 CJ est. value
Saint Joseph, MO 64501

Centennial Hall Roof Replacement
Renovation
Sub-Bidding
$350,000 CJ est. value
Columbia, MO 65203

Roof Replacement at the Student Center Building on the Hillsboro Campus
Alteration
Post-Bid
Hillsboro, MO 63050

Spring Bend Cabin Roof Replacement
Alteration
Post-Bid
Saint Charles, MO 63303

Euclid Plaza Roof Replacement and Building Exterior Repairs
Alteration
Results
Saint Louis, MO

Police Department Firing Range Lower Classroom Roof Replacement
Alteration
Results
Defiance, MO 63341

Division of Youth Services Improvements - Roof Replacements
Renovation
Construction
$115,429 CJ est. value
Cape Girardeau, MO 63701

Roofing Services
Term Contract
Sub-Bidding
$280,000 CJ est. value
Kansas City, MO 64106

2022 Roof Replacement
Renovation, Alteration - 20,000 SF
Post-Bid
Clayton, Creve Coeur, MO 63124

Roof Repairs and Waterproofing
Alteration
Results
Affton, Hanley Hills, MO 63123

Roofing Services
Term Contract
Sub-Bidding
Blue Springs, MO 64015

Fairmount Elementary School Roof Improvements
Alteration
Post-Bid
Independence, MO 64053

Roof Replacement
Alteration
Results
Tipton, MO

Replace Roofs-Multiple Assets-Ozark Correctional Center
Renovation
Sub-Bidding
$210,000 CJ est. value
Jefferson City, MO 65101

Prospect Plaza - Roofing
Alteration
Post-Bid
Gladstone, MO 64118

Last Updated 05/02/2023 09:08 AM
Project Title

Perry County Middle School Multipurpose Re-Roofing

Physical Address View project details and contacts
City, State (County) Perryville, MO 63775   (Perry County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $88,774 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Perry County D32 School District will receive Bids for the above referenced project. Work shall entail the removal of approximately 8,700 sf of existing roofing ballast over the entire roof area of the existing Perry County Middle School Multipurpose leaving the existing membrane roofing in place, removal of the pre-finished metal parapet edge flashing, removal of the perforated gravel stop and removal of the pre-finished metal gutter and downspouts. The School District will be responsible for the installation of the new gutter and downspouts. The new TPO membrane roofing system shall consist of a fully adhered membrane over a fiber reinforced gypsum cover board mechanically fastened through the existing rigid roofing insulation and secure into the existing metal roof decking. Fiber reinforced gypsum cover board shall be installed on the backside of the parapet walls prior to extending the new TPO membrane roofing up the parapet walls and secured under the new pre-finished metal coping. Please contact Jeffrey A. Keim at incite Design Studio at jkeim@inciteDesignStudio.com or 314-279-4500 with any questions regarding scope or access to the documents.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents