Similar Projects
Performance-Based ITS Maintenance
Infrastructure
Bidding

Performance-Based ITS Maintenance
Infrastructure
Bidding

APL Traffic Equipment
Term Contract
Post-Bid
Tallahassee, FL 32300

Vehicle and Bicycle Detection Loops
Post-Bid
Orlando, FL 32802

Traffic Signals - Old Canoe Creek Road and Nolte Road
Results
Saint Cloud, FL 34772

Temporary Traffic Control - Annual
Term Contract
Results
Port Charlotte, FL 33948

Push-Button Contract for Traffic Signal Improvements - South
Infrastructure
Post-Bid
$2,727,223 est. value
Coral Gables, Kendale Lakes, Miami, South Miami, West Miami, FL 33186

Traffic Signals
Results
Less than $678,998 est. value
DeBary, FL 32713

Traffic OPS Improvement
Results
Less than $500,000 est. value

Construction of New Traffic Signal at Intersection of CR-13A (Pacetti Road) and Meadowlark Lane / Samara Lakes Parkway
Results
Less than $517,000 est. value
Saint Augustine, FL 32084

Traffic Control Devices/System/Roadway Signing
Results
Less than $3,505,912 est. value
FL

Traffic Signal Repair
Results

Pre-Event Emergency Traffic Signal Permanent Repair
Results

Electrical Work
Results
Less than $680,095 est. value
FL

Push-Button Contract for Traffic Signal Improvements - South
Results
Less than $2,919,354 est. value
FL

Last Updated 07/26/2021 08:01 AM
Project Title

Maintenance of Traffic (MOT) Devices for CR-210 Corridor East of I-95

Physical Address View project details and contacts
City, State (County) FL 32095   (Saint Johns County)
Category(s) Heavy and Highway
Sub-Category(s) Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall be responsible for providing any and all labor, materials, and equipment required for handling Maintenance of Traffic (MOT) devices on the CR 210 corridor East of I-95, which encompasses four intersections (CR-210/Beachwalk Boulevard, CR-210/Beachwalk Shore Drive/Beacon Lake Parkway, CR-210/Beachwalk Boulevard/Beacon Lake Parkway, and CR-210/Old CR-210), as specified on the attached MOT plans (Exhibit “A”). The MOT along County roadways shall be in accordance with Florida Department of Transportation (FDOT) Index 602 at a minimum. MOT is anticipated for up to twelve (12) months duration with options to extend the time, as necessary.

Details

Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents