Similar Projects
2022 Roof Replacement
Alteration
Post-Bid
Marengo, IL 60152

2022 Capital Improvements
Renovation
Post-Bid
Cary, Crystal Lake, IL 60013

2022 HVAC Improvements - Mechanical Equipment BG 1 BP #1-4
Alteration
Results
Crystal Lake, IL 60014

Roof System Replacements And Restoration
Alteration
Results
$682,000 est. value
Huntley, IL 60142

Snow Removal
Term Contract
Post-Bid
Algonquin, IL 60102

Auditorium House Lighting LED Improvements
Renovation, Alteration
Results
$200,000 est. value
McHenry, IL 60050

Richmond Burton High School LRC Renovations
Renovation
Post-Bid
$2,000,000 CJ est. value
Richmond, IL 60071

Concrete - Various Sites District Wide Plus Alternative Work
Alteration
Results
Algonquin, Carpentersville, IL 60102

2023 Summer Renovations - Bid Release 1
Infrastructure, Renovation
Post-Bid
$10,000,000 CJ est. value
Algonquin, IL 60102

2022 HVAC Improvements - Bid Group 2 Bid Packages 1-6
Renovation, Alteration
Results
Crystal Lake, IL 60014

2023 Health Life Safety Improvements
Renovation
Post-Bid
$331,000 CJ est. value
Woodstock, IL 60098

2022 Structural Repairs At Marengo Community High School
Renovation
Results
Marengo, IL 60152

Prairie Grove Consolidated School District #46 - Summer 2023 Renovations
Renovation - 15,000 SF
Post-Bid
$5,000,000 CJ est. value
Crystal Lake, IL 60014

2022 Tennis Court Reconstruction
Renovation, Alteration
Results
Marengo, IL 60152

Prairie Grove Community School District 46 Summer 2023 Renovations
Renovation - 15,000 SF
Post-Bid
$5,000,000 CJ est. value
Crystal Lake, IL 60014

Last Updated 04/17/2023 11:08 AM
Project Title

TLC Classroom Improvements - Cary Junior High School

Physical Address View project details and contacts
City, State (County) Cary, IL 60013   (McHenry County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $540,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project Duration: August 1st On your quote, please include your phone number and email address so that we can easily contact you if we have any questions. Under no circumstances are the owner or the architect to be contacted directly. All questions and RFI's must be submitted to The Dubs Company. Please send your questions and submit your bid to: bid@dubsco.com Please note contrary to what the plans may or may not state: - All trades are responsible for fire caulking their own work. - No MEP substitutions will be allowed.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents