Similar Projects
South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Hilton Garden Inn / Pensacola
Addition, Demolition, Infrastructure - 1,800 SF
Design
$500,000 CJ est. value
Pensacola Beach, FL 32561

P282 AHTS Aircraft Flight Simulator Facility - Whiting Field
New Construction, Infrastructure
Bidding
$100,000,000 CJ est. value
Milton, FL 32570

Bridge Repair
Infrastructure
Bidding
$298,952 CJ est. value
Jay, FL 32565

Milton Downtown Waterfront Marina, Residential and Mixed-Use Development Opportunity
New Construction, Infrastructure
Post-Bid
$700,000 CJ est. value
Milton, FL 32570

RFP Engineering - Multilane Design SR 30 (US 98) in Santa Rosa County
Infrastructure
Post-Bid
$4,100,000 CJ est. value
Gulf Breeze, FL 32563

Villa Venyce Entrance Channel Dredging
Infrastructure
Results
$782,000 CJ est. value
Milton, FL 32570

Randy Brown Road Extension
Infrastructure
Results
$5,645,335 CJ est. value
Milton, FL 32583

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Bridge Repair/Rehabilitation
Infrastructure
Construction
$278,513 CJ est. value
Milton, FL 32583

Oasis Resort and Escape Family Center
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Pensacola Beach, FL 32561

Nantahala Beach Apartments
New Construction, Infrastructure - 99,278 SF
Pending Verification
$27,000,000 CJ est. value
Gulf Breeze, FL 32563

Floridatown Park Repairs
Infrastructure
Bidding
$200,000 CJ est. value
Pace, FL 32571

AutoZone #5548 / Navarre
New Construction, Infrastructure - 7,000 SF
Post-Bid
$1,500,000 CJ est. value
Navarre, FL 32566

Swenson Park Facilities Improvements
Infrastructure
Results
$667,327 CJ est. value
Gulf Breeze, FL 32563

Last Updated 01/10/2023 11:10 AM
Project Title

Eglin Federal Credit Union / Gulf Breeze

Physical Address View project details and contacts
City, State (County) Gulf Breeze, FL 32563   (Santa Rosa County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Bank, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $1,200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project to include the construction of a new financial facility. As of August 24, 2022, the project is in the early planning stages. A design-build firm has been selected. While a firm construction timeline is undetermined at this time, construction is not expected to commence prior to the first quarter of 2024. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

4,695 SF.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation.
Division 08 - Openings, Metal Doors and Frames, Special Function Doors, Entrances and Storefronts, Special Function Hardware, Special Function Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Partitions, Emergency Access and Information Cabinets, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Security Mirrors and Domes.
Division 11 - Equipment, Security, Detention, and Banking Equipment, Vault Equipment, Safe Deposit Boxes, Safes, Vault Ventilators, Teller and Service Equipment.
Division 12 - Furnishings, Art, Window Treatments, Specialty Casework, Bank Casework, Furniture, Office Furniture.
Division 13 - Special Construction, Vaults, Security Vaults.
Division 14 - Conveying Equipment, Pneumatic Tube Systems.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs, Gutters, Sidewalks, and Driveways, Curbs and Gutters, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents