Similar Projects
Plumbing Shop Exhaust Updates
Bidding
$75,000 est. value
Lowell, MA

Energy Recovery Unit Replacements at Hudson High School
Bidding
$700,000 est. value
Hudson, MA 01749

Maintenance and Service of Rink Refrigeration Systems
Post-Bid
Less than $1,500,000 est. value

Framingham High School HVAC Upgrades - General Bids
Post-Bid
Framingham, MA 01702

Crocker Hall Interior Renovations Phase 1 - Filed Sub-Bids
Results
Less than $660,000 est. value
Framingham, MA

Solomon Building Boiler Replacement - General Bids
Results
Less than $1,000,000 est. value
Cambridge, MA 02138

Design and Construction of Diffused Aeration/De-Stratification System for Town Reservoir
Bidding
Wakefield, MA

Water Treatment Plant Ozone and Plant Upgrades - Sub-Bids
Post-Bid
Billerica, MA

UMass Amherst Mount Ida Campus Building 770 Room 118 HVAC
Results
$240,000 est. value
Newton, MA 02459

Capen Court Air-Cooled Chiller Compressor Replacement
Bidding
$16,500 est. value
Somerville, MA 02144

Corrective Maintenance HVAC Systems Service
Term Contract
Post-Bid
Less than $700,000 est. value
Framingham, MA 01702

Bemis Water Treatment Plant - Filed Sub Bid
Results
Less than $7,400,000 est. value
Pepperell, MA 01463

North High School Chiller and Related Equipment Service
Bidding
$125,000 est. value
Newton, MA

HVAC Replacement - Two Systems
Post-Bid
Less than $45,000 est. value
Stow, MA 01775

Z--Rehab HVAC System, Assabet NWR, Sudbury MA
Results
Sudbury, MA

Reported 03/19/2021 12:00 AM
Project Title

J041--Repair RTU Unit Bldg 78

Physical Address View project details and contacts
City, State (County) Bedford, MA 01730   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Vendor shall install new discharge service valve, dryer & site glass for circuit 1. Replace oil site glass on compressor. Check operation of VFD drive & supply for return fan & economizer. VA shall recover, dispose & supply refrigerant. All debris, fluids, and any other hazardous waste collected as part of this service, shall be properly disposed of off-site. Vendor will follow all applicable Local, State & Federal requirements for proper disposal. All work will be coordinated through the Contracting Officers Representative (COR) and/or the Boiler Plant Supervisor. Work will be completed one pump at a time with no disruption to plant operations, if a shutdown is necessary, it will be at a time when it will cause the least disruption to the staff and patients of the hospital. All work shall take place at 200 Springs Road BLDG 78 Bedford Ma, 01730

Details

Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Heating Boilers, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents