Similar Projects
Last Updated | 04/05/2023 11:20 AM |
Project Title | Smithville School District - Package |
Physical Address | View project details and contacts |
City, State (County) | Smithville, MO 64089 (Clay County) |
Category(s) | Education, Heavy and Highway |
Sub-Category(s) | Elementary School, Middle/Senior High School, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $5,000,000 [brand] Estimate |
Plans Available from | Construction Manager |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The 2023 Summer Improvements package includes sidewalk renovations on the main campus, replacement of RTUs at the Middle School and Horizon Elementary, and interior renovations to the High School. Bid packages include Selective Demo, Structural Steel and Miscellaneous Metal, Metal Framing, Drywall, Acoustical Ceilings, and Misc. Specialties, Joint Sealants, Painting, Tile, Resinous Flooring, Plumbing, HVAC, Electrical, Earthwork and Site Utilities, and Site Concrete. The work includes HVAC replacement at the Middle School and Horizon Elementary, Sidewalk improvements, interior renovation to a restroom at the High School and demo of an existing wall in the High School gymnasium. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |