Similar Projects
I-5/179th Street Interchange - Interchange Improvements
Infrastructure
Conception
$42,001,000 CJ est. value
Tacoma, WA 98409

I-5/179th Street Interchange - Interchange Improvements
Infrastructure
Conception
$42,001,000 CJ est. value
Tacoma, WA 98409

I-5/Denny Way - Lakeview Viaduct - Deck Overlay and Expansion Joint
Infrastructure
Design
$26,186,000 CJ est. value
Tacoma, WA 98409

I-5/Denny Way - Lakeview Viaduct - Deck Overlay and Expansion Joint
Infrastructure
Design
$26,186,000 CJ est. value
Tacoma, WA 98409

Edison, Whitman, Lincoln Safe Routes to Schools - REBID
Infrastructure
Bidding
$1,366,850 CJ est. value
Tacoma, WA 98405

Edison, Whitman, Lincoln Safe Routes to Schools - REBID
Infrastructure
Bidding
$1,366,850 CJ est. value
Tacoma, WA 98405

VA American Lake Phase 2 Site Development
Demolition, Term Contract, Infrastructure, Alteration
Post-Bid
$10,000,000 to $25,000,000 est. value
Tacoma, WA

I-5, Mounts Road to Steilacoom - DuPont Road - Corridor Improvements
Infrastructure
Post-Bid
$210,000,000 CJ est. value
Fife, WA 98424

SR 167,I-5 to SR 509 - New Expressway
Infrastructure
Results
$325,000,000 to $375,000,000 est. value
WA

Nisqually State Park Maintenance Building Phase 1
New Construction, Infrastructure, Alteration
Results
$1,289,979 est. value
Eatonville, WA 98328

Point Defiance Zoo and Aquarium South Pacific Aquarium Tank and Exhibit Improvements
Renovation, Infrastructure
Construction
$3,736,964 CJ est. value
Tacoma, WA 98407

Frederickson Self Storage
New Construction, Infrastructure - 95,000 SF
Pending Verification
$10,300,000 CJ est. value
Tacoma, WA 98446

Frederickson Self Storage
New Construction, Infrastructure - 95,000 SF
Pending Verification
$10,300,000 CJ est. value
Tacoma, WA 98446

I-5/SB over I-705 and RR - Special Repairs
Infrastructure
Conception
$750,000 CJ est. value
Tacoma, WA 98418

Sixth Avenue Apartment Development
New Construction, Infrastructure
Design
$150,880,000 CJ est. value
Tacoma, WA 98406

Last Updated 02/24/2023 08:01 AM
Project Title

I-705/I-5 to Pacific Ave - Expansion Joint Replacement Stage 3

Physical Address View project details and contacts
City, State (County) Tacoma, WA 98402   (Pierce County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $795,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

STIP ID WDO-460 The strip seal expansion joints on these structures have reached the end of their usable service life and need replacement. This project will replace the expansion joints to extend the service life of the structures. Replace expansion joint on bridges 705/6N-E, 705/10N-N, 705/6S-N, 705/6W. As of February 24, 2023, this project is in Design status. Preliminary engineering is expected to begin in the second quarter of 2022 and environmental design is expected to be completed in the third quarter of 2023. The contract advertisement is expected in Second quarter of 2022 and construction is anticipated to be operationally complete in the third quarter of 2023. WSDOT - I-705/I-5 to Pacific Ave - Expansion Joint Replacement Stage 3 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents