Similar Projects
Locker Replacement at Driggs and Sprague Elementary Schools
Post-Bid
Waterbury, CT 06710

Residential Weatherization
Term Contract, Alteration
Post-Bid
Bridgeport, CT

Installation of Safety Railings and Acoustical Ceiling
Results
Hartford, CT 06106

Waterbury Arts Magnet School Gymnasium Wall Padding Perimeter
Results
Waterbury, CT 06706

New and Modified Casework
Alteration
Post-Bid
Berlin, CT 06023

Burr & Naylor School Bathroom Improvements
Results
$180,000 est. value
Hartford, CT 06114

Interior Improvement - Ferguson Library
Alteration
Post-Bid
Stamford, CT 06905

Stamford Transportation Center Concourse Ceiling Replacement
Results
Stamford, CT 06902

District-Wide Acoustical Ceiling Tile System Replacement
Results
Cheshire, CT 06410

North Mianus School Ceiling Replacement
Alteration
Results
Greenwich, CT 06878

Norwich Health Center Installation of Glass and Soffit Drywall Work
Alteration
Results
Norwich, CT

Ceiling and Lighting Project at the McGee Middle School Media Center
Alteration
Results
Berlin, CT 06037

City Hall Plaster Repair and Restoration Work
Alteration
Results
New London, CT

Glastonbury Elementary Schools Locker Replacement
Alteration
Results
Glastonbury, CT

Divider Wall Replacements
Alteration
Results
Storrs, CT

Last Updated 04/12/2022 02:27 PM
Project Title

7230--Installing an Awing South Entrance of Bldg 4

Physical Address View project details and contacts
City, State (County) Newington, CT 06111   (Hartford County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this one-time requirement is to supply a new Awning with Side Curtains and provide all labor and materials necessary to install the Awning with side curtains at the Newington Facility, Building 4 South Entrance . The contractor shall provide and install an Awning with Side Curtains: Awning shall be 6’ wide, projection of 17’ by 3’ height, frame type traditional w/rigid valance, fabric attachment, staple. Shall be attached to the building (brick wall) with 2” Z Bracket and Hilti 3/8 Wedge Anchors” embedment. 8’ POSTS: 1.5 schedule 40 galvanized posts attached to Awning and concrete deck. FRAME work: 1 X 1 Aluminum Tube and welded at all joints Fabric: Weldon (deep sea blue) Flame Resistant (meets all building code 5 Year warranty.) Side Curtains (welded frame)

Details

Division 09 - Finishes.
Division 10 - Specialties, Protective Covers, Awnings.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents