Similar Projects
Saltwater Properties, LLC
New Construction - 4,800 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Wilmington, NC 28401

Amtrak ADA Station Program - Selma Smithfield Station
New Construction, Renovation, Alteration - 5,890 SF
Bidding
Selma, NC 27576

Bus Shelter Installation and Maintenance
Renovation
Bidding
Chapel Hill, NC

Bus Shelter Installation Services
Post-Bid
Fayetteville, NC 28302

Bus Shelter Installation
Post-Bid
Hendersonville, NC 28792

Redevelopment of the Former Wave Transit Maintenance Facility
Results
Wilmington, NC

Purchase of Bus Stop Shelters and Amenities
Results
Winston-Salem, NC 27101

GTA Depot Ticketing Renovation
Renovation
Construction
Greensboro, NC 27401

Fire and Emergency Training Center
New Construction - 28,393 SF
Construction
Less than $16,000,000 est. value
Fayetteville, NC 28303

North Carolina Freedom Park
New Construction
Pending Verification
$3,000,000 est. value
Raleigh, NC 27601

Design Build Services for Electric Operations Center
New Construction - 97,200 SF
Post-Bid
Less than $19,380,500 est. value
Concord, NC

Manufacture AV-8 Wing Stands
Results
Cherry Point, NC

Maintenance for the Charlotte I-85 WIM Weigh Station
Term Contract
Post-Bid
Charlotte, NC

Glenview Station Amenity Improvements
Results
Less than $74,351 est. value
Durham, NC 27703

Enhanced Bus Stop Shelters
Post-Bid
Raleigh, NC

Reported 08/04/2021 12:00 AM
Project Title

Paticipatory Budget Bus Shelter Project

Physical Address View project details and contacts
City, State (County) Durham, NC   (Durham County)
Category(s) Transportation
Sub-Category(s) Misc. Structures
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Participatory Budgeting has allocated funds to install bus shelters at existing stops that lack shelters and other stop amenities in nearby areas. Included in the project are additional elements such as artwork commissioned by local artists, usage of renewable materials, and solar panel installations to power USB charging stations and lighting to improve rider safety. This project will make improvements to nine (9) existing bus stops throughout the City of Durham. The work includes installation or repair of concrete pads, installation of shelters, solar light poles, purchase and installation of bike racks, and garbage cans. The shelter structures have been purchased by City of Durham and located on GoTriangle property located at 324 W Lane Street, Raleigh, NC. Contractor is responsible for pick-up of shelters. Ward 1 • Bus Stop # 6658 - E Main Street at Angier Ave • Bus Stop # 5084 - Old Farm Rd at Roxboro St • Bus Stop # 5646 - Roxboro Rd at Davidson Ave Ward 2 • Bus Stop # 6256 - Fayetteville at Cook Road • Bus Stop # 5690 - NC 54 at NC 55 • Bus Stop # 6016 - Lawson St at Bacon St Ward 3 • Bus Stop # 5292 - Hillsborough Road at Neal Road • Bus Stop # 5332 - University Drive at Shannon Drive • Bus Stop # 1075 - University Dr at Ivy Creek Blvd

Details

Misc. Structures, New Construction.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Protective Covers, Transportation Stop Shelters.
Division 12 - Furnishings, Multiple Seating, Pews and Benches, Benches.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents