Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

PA 88 over Whiteley Creek
Infrastructure, Renovation
Design
$5,115,400 CJ est. value
Greensboro, PA 15338

PA 88 over Whiteley Creek
Infrastructure, Renovation
Design
$5,115,400 CJ est. value
Greensboro, PA 15338

Waynesburg Betterment
Infrastructure
Bidding
$10,000,000 CJ est. value
Waynesburg, PA 15370

Waynesburg Betterment
Infrastructure
Bidding
$10,000,000 CJ est. value
Waynesburg, PA 15370

Goodwin Hill Road Improvements Project - Phase 2
Infrastructure
Post-Bid
Spraggs, PA 15362

Coon Run Road Culvert Replacement Project
Infrastructure
Post-Bid
Aleppo, PA

State Game Lands #183 Shooting Range Improvements
Results
Palmyra, PA

Chesapeake Bay Watershed Pollution Reduction
Infrastructure
Results

SR 1009 over Castile Run - DFB
Demolition, New Construction, Infrastructure
Conception
$250,000 CJ est. value
Waynesburg, PA 15370

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

SCI Greene - Soil Remediation and Structural Repairs - Phase 2
Renovation, Infrastructure
Bidding
$2,310,000 CJ est. value
Waynesburg, PA 15370

23 WHM SGL 211 Railroad Grade Road Phase 1
Infrastructure
Post-Bid

SR 4025 Over BR Browns CK - DFB
Infrastructure
Results
$200,000 to $499,999 est. value
PA

Last Updated 02/13/2023 07:41 AM
Project Title

SR 3018 over Br Blacks Ck - DFB

Physical Address View project details and contacts
City, State (County) Richhill Township, PA 15380   (Greene County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $219,076 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the design, fabrication, and delivery of a Precast R.C. Box Culvert, at a department prepared site, as indicated on the approved drawing S-40046 included in the bid package for STATE ROUTE 3018, SECTION 01M, in Greene County, Aleppo Township. Project Cost Range: $100,000.00 - $199,999.99 Federal Project Status: Non - Federal (100% State) Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: BRIDGE REPLACEMENT 408 Version: 2020-5 PENNDOT-SR 3018 over Br Blacks Ck - DFB *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents