Similar Projects
Bangs ISD Security Upgrades - Middle School
Renovation - 500 SF
Design
$275,000 CJ est. value
Bangs, TX 76823

Bangs ISD Security Upgrades - Elementary School
Renovation - 500 SF
Design
$275,000 CJ est. value
Bangs, TX 76823

Intersection Improvements With Right and/or Left T
Infrastructure
Bidding
$610,937 CJ est. value
Early, TX 76802

Intersection Improvements With Right and/or Left T
Infrastructure
Bidding
$610,937 CJ est. value
Early, TX 76802

Jack C. Hays HS - Bleachers
Renovation
Post-Bid

Autumn Drive Reconstruction
Infrastructure
Post-Bid
$500,000 est. value
Early, TX 76802

New Lab Building - District HQ
Infrastructure
Results
$1,800,000 est. value
Brownwood, TX 76802

San Marcos Aquatic Resources Center - Rehabilitation and Realignment of The Entrance Road
Term Contract
Results
$1,000,000 to $5,000,000 est. value
San Marcos, TX 78666

Academy of Freedom Renovation / Howard Payne University
Renovation, Infrastructure - 17,572 SF
Pending Verification
$3,100,000 CJ est. value
Brownwood, TX 76801

Academy of Freedom Renovation / Howard Payne University
Renovation, Infrastructure - 17,572 SF
Pending Verification
$3,100,000 CJ est. value
Brownwood, TX 76801

Bangs ISD Security Upgrades - High School
Renovation - 500 SF
Design
$275,000 CJ est. value
Bangs, TX 76823

2022 Street Repair of Chihuahua Street and River Road. Intersection, and Preservation of Lauren Court, Hillcrest Drive, and Kyle Street
Infrastructure
Post-Bid
$700,000 est. value
La Vernia, TX

US0067 - Mill and Inlay
Infrastructure
Results
$426,253 est. value
TX

Take 5 Oil / Brownwood
New Construction, Infrastructure - 1,421 SF
Pending Verification
$500,000 CJ est. value
Brownwood, TX 76801

Family Dollar Tree / Brownwood
New Construction, Infrastructure - 10,500 SF
Design
$500,000 CJ est. value
Brownwood, TX 76801

Last Updated 02/22/2023 12:56 PM
Project Title

2023 Bond - Brownwood Independent School District

Physical Address View project details and contacts
City, State (County) Brownwood, TX 76801   (Brown County)
Category(s) Commercial, Education, Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Elementary School, Middle/Senior High School, Office, Park/Playground, Paving/Reconstruction, Site Development, Stadium
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $59,950,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 22, 2023, the Brownwood Independent School District has approved issuing $59.9 million bond scheduled for May 6, 2023, bond election. The bond calls for Proposition A, at $27,650,000, features the following district-wide projects: safety and security upgrades across the district, renovate Snodgrass Facility, new field house at high school (locker rooms, weight room, training room, conference room, offices, storage, laundry), renovate locker rooms at high school, accessible seating in high school gym, tennis improvements (Remove/replace courts, new scoreboard, new lights, new bleachers, windscreen), baseball/Softball improvements (renovation of baseball field with new bleachers, dugouts, backstop, canopy over batting cages); New lights for baseball and softball fields, renovate middle school locker rooms, new gym flooring at all elementary campuses, and new intermediate school auditorium seats. Proposition B, at $16,300,000, revolves around the following improvements to Gordon Wood Stadium: Home bleacher addition (1,000 seats), ADA/code improvements (Ramp access, aisles and stairs renovated for code compliance, ADA parking), new lights, new concessions/restrooms, new press box with elevator, and new turf and track resurface. Proposition C, at $16,000,000, calls for the construction of an indoor student activity center at BHS that will feature: Use by band, baseball, softball, football, soccer, PE, and others, 80 yards of turf, and training room, dressing rooms, storage, offices. Further details regarding design and construction timelines have not been disclosed.

Details

Division 01 - General Requirements, Construction Facilities.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting, Special Coatings.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Playground Equipment, Play Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Clearing and Grubbing, Selective Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents