Similar Projects
Replace MEP Systems at Lecture Center at SUNY New Paltz
Post-Bid
New Paltz, NY 12561

FAB Heating Upgrade
Post-Bid
New Paltz, NY 12561

Signage
Results
Shandaken, NY 12480

Install Ductless Air Conditioner
Results
Less than $25,000 est. value
Saugerties, NY 12477

Glass Wall Installation
Post-Bid
Kingston, NY 12402

HVAC Replacement for SUNY Ulster Burroughs Hall
Term Contract
Results
Stone Ridge, NY 12484

HVAC Engineering/Design for Trudy Resnick Farber Building
Term Contract
Post-Bid
Ellenville, NY 12428

Smiley Art Building Art Storage AC Upgrade at SUNY New Paltz
Results
New Paltz, NY 12561

HVAC Replacement for SUNY Ulster Campus
Post-Bid
Marbletown, Stone Ridge, NY 12484

Ellenville Middle / High School HVAC Improvements
Results
Ellenville, NY 12428

KHS Kate Walton Field House Pool Dectron RTU Replacement
Post-Bid
Kingston, NY 12401

HVAC Control System Upgrade Ulster County Courthouse
Results
Kingston, NY 12402

Clean & Tunes of Gas and Oil-Fired Furnaces, and Gas and Oil-Fired Water and Steam Boilers
Term Contract
Post-Bid
NY 12401

HVAC Maintenance
Term Contract
Results
$50,000 to $500,000 est. value
Highmount, Lake Placid, North Creek, Wilmington, NY

Preventive Maintenance for Automated Logic HVAC Controls
Term Contract
Post-Bid
Kingston, NY 12401

Last Updated 02/07/2020 12:14 PM
Project Title

Upgrade Lecture Center Mechanical Systems at SUNY New Paltz

Physical Address View project details and contacts
City, State (County) New Paltz, NY 12561   (Ulster County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior, HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes the replacement and upgrade of the HVAC systems that serve the lecture rooms and surrounding lobby spaces of the Lecture Hall Building. All finishes in the North Lobby, South Lobby and West interconnecting Hallway will be removed and replaced including flooring, walls, ceilings, lighting, fire protection systems and HVAC ductwork. New fin-tube radiation units will be provided at lobby perimeter. Lobby areas will receive a new curtain wall glazing system. At North and South Pedestrian Bridges, finishes will be replaced and a new glazed enclosure will be provided. Hazardous materials abatement associated with the above work will be required. EEO goals for this project: 6% minority workforce and 3% female workforce

Details

Division 08 - Openings, Curtain Wall and Glazed Assemblies.
Division 09 - Finishes, Ceilings, Flooring.
Division 10 - Specialties, Fire Protection Specialties.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Interior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents