Similar Projects
Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

A251-935 Const. HVAC Upgrades Lancaster County
Results
Less than $99,999 est. value
PA

A251-0935, HVAC Installation Lunch Room and Garage Office
Results
Less than $99,999 est. value
PA

Mechanical (HVAC) Rehabilitation, Repair and Renovation of Various Sites (Including Cdbg Areas)
Post-Bid
Pittsburgh, PA

Heiges Field House Replace Environmental Unit
Results
Shippensburg, PA

Hvac and Refrigeration Service and Maintenance
Post-Bid
PA

Chiller Overhaul
Results
PA

Verizon New Castle - HVAC First Floor
Renovation, Addition - 10,800 SF
Post-Bid
$360,000 est. value
New Castle, PA 16101

FM6373 HVAC Pers Staging
Results
$100,000 to $199,999 est. value
PA

HVAC/Electrical Contractors
Post-Bid
Lewisburg, PA

Founders Hall Controls Upgrade
Results
Lock Haven, PA

Verizon West Middlesex HVAC Electrical Upgrades
Renovation, Addition - 3,000 SF
Post-Bid
$360,000 est. value
West Middlesex, PA 16159

Supply and Installation of a Turnkey Sound Proofed Booth and Ventilation System for the Flame Spray Operation in Building 350
Results
Chambersburg, PA 17201

Verizon Erie South - Generator and HVAC Upgrades
Renovation
Post-Bid
$360,000 est. value
Erie, PA 16510

Last Updated 12/11/2018 09:41 AM
Project Title

Chilled Water Plant System Expansion

Physical Address View project details and contacts
City, State (County) University Park, PA   (Centre County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The scope of work for this DGS-funded project consists of the complete removal of the existing roof and replacement with a new 3-ply roofing system located at the cooling tower area of the North Campus Chilled Water Plant as indicated on the drawings and specifications. The roof replacement work will be conducted with the chiller plant in full operation, so dried-in conditions will need to be maintained at all times. The roof replacement area is comprised of approximately 14,500 sq ft. There are existing HVAC rooftop units, ductwork, piping, and other equipment that is to remain in place. All mechanical and electrical work will be completed under current contracts.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents