Similar Projects
On-Site Sludge Conveyor System Belt Modification Service
Renovation
Bidding
Houston, TX

East Basin Mixer Project
Renovation
Bidding
Plainview, TX

Odor Control Services for WWTP
Post-Bid
Less than $50,000 est. value
Corpus Christi, TX 969917

Blackhorse Ranch WWTP Recoating
Post-Bid
TX

Wastewater Treatment Plant Facilities Rehabilitation
Results
Less than $3,500,000 est. value
Houston, TX 77000

Contract 1 - Intake and Water Treatment Plant
Results
Less than $7,032,561 est. value
Mart, TX 76664

John T. Hickerson WRP Ultraviolet Disinfection Replacement
Renovation
Bidding
El Paso, TX 79922

Construction of Harrington Trails Phase I WWTP Site Work and Wet Well
Post-Bid
TX

Wastewater Treatment Plant Expansion to 0.99 MGD
Results
Katy, TX 77493

Wastewater Treatment Plant Decanter Centrifuge
New Construction
Bidding
Anderson, TX

Lazy Nine Mud 1A Wastewater Treatment Plant Phase 1 Protective Coatings
Post-Bid
Austin, TX 73301

New Boston WWTP Equalization Basin
Results
$1,900,000 est. value
New Boston, TX 75570

Reverse Osmosis Deionization Water System Maintenance Services
Renovation
Bidding
Austin, TX

Berry Creek Highlands - Phase I
Post-Bid
Georgetown, TX 78746

HPW - Sims Bayou South Wastewater Treatment Plant Improvements
Results
$14,707,300 est. value
Houston, TX 77251

Last Updated 06/19/2021 12:34 AM
Project Title

Terrell Kings Creek Wastewater Treatment Plant Phase II Improvements

Physical Address View project details and contacts
City, State (County) Terrell, TX 75160   (Kaufman County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Constructing a new flow splitting structure, new aeration basins including a new blower facility, new final clarifier, new sludge pumping station, and a new electrical building with electrical distribution and standby power generator. Plant rehabilitation items include rehabilitated final clarifier, rehabilitated electrical gear, replacement of valves in raw water pump station, and modifications to the existing administration building including relocating a door and providing new ventilation equipment to the pump area. The project includes demolition, new facilities, and facility enhancement throughout the plant. The project includes an associated array of piping enhancements and civil/yard enhancements, together with electrical, instrumentation, and control enhancements to develop a complete and functional facility. The Project is located at the Terrell Kings Creek WWTP, 101 Mt. Hebron Road, Terrell, TX 75160.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents