Similar Projects
Last Updated | 09/03/2020 05:49 PM |
Project Title | Boiler 2 Replacement at Sandoval Elementary School |
Physical Address | View project details and contacts |
City, State (County) | Chicago, IL 60629 (Cook County) |
Category(s) | Single Trades |
Sub-Category(s) | Mechanical |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Provide all labor and materials to complete the following: Disconnect and remove the existing Lochinvar boiler #2, Install one new Lochinvar 1800 MBH boiler with hi - low gas pressure kit, low water cut off manual reset kit and 90 GPM boiler pump, Pipe and wire the new boiler, Check for proper operation when complete, This is a general description of the scope. Vendor to provide all components, accessories, labor, etc. to furnish a fully functioning boiler. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |