Similar Projects
Advanced Metering Infrastructure Program
Post-Bid
Clewiston, FL 33440

Cottondale CDBG Water Main Improvements
Post-Bid
Cottondale, FL

Construction Manager-at-Risk for Belmonte Road and Pershing Way Water and Sewer Improvements
Results
Less than $200,000 est. value
West Palm Beach, FL

South Sewall's Point Road Phase 1
Results
$2,915,034 est. value
Sewall's Point, FL 34996

Construction Services for Becker Road Phase 3 Infrastructure Improvements (Veranda Gardens Boulevard to Gilson Road)
Post-Bid
Port Saint Lucie, FL 34984

Sitework and Utility Installation
Results
Sarasota, FL

3 Line - Pipe Repair 2, 4, 6" O.D.
Post-Bid
Lakeland, FL

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Construction Services for Veranda Estates, Phase 1 Infrastructure Improvements
Post-Bid
Port Saint Lucie, FL

Water Main Improvements Design-Build
Term Contract
Results
Less than $50,000,000 est. value
Tampa, FL

South County Reclaimed Water Transmission Pipeline Phase 1A
Results
$7,000,000 est. value
West Palm Beach, FL

Green Meadows Water Main Replacement
Results
Less than $250,000 est. value
Belleview, FL

GTL Dewatering Building Drain/Vent Pipe Replacement
Results
Fort Lauderdale, FL 33316

General Contractor - Utility Systems
Term Contract
Results
Cocoa, FL 32922

Infrastructure Locator Contractor
Term Contract
Results
Orlando, FL 32801

Last Updated 04/22/2022 12:05 AM
Project Title

Glades to Tradition Reuse Water Main Construction Project

Physical Address View project details and contacts
City, State (County) Port Saint Lucie, FL   (Saint Lucie County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the installation of approximately 12,200 linear feet of new 24-inch reuse water main pipe from the end of the existing reuse water main near Glades Cut-off Road and in an existing easement and ending near the existing City of Port St. Lucie Glades Wastewater Booster Pump Station in Tradition Boulevard right-of-way. This length includes approximately 9,200 linear feet of 24-inch C-900 reuse water main pipe installed via open-cut and 3,00 linear feet of 24-inch DR-11 HDPE reuse water main pipe by horizontal directional drill method. In addition, approximately 660 linear feet of 36-inch C-900 wastewater force main is included at the north end of the project. This project is to include all fittings, valves, appurtenances, and pipe associated with the installation of the horizontal drill in addition to all fittings, valves, appurtenances, and pipe associated with the open-cut installation of the C-900 PVC reuse water and forces mains, connections to the existing reuse water and force mains, and obtaining of any required permits. All testing services and restoration services are to be included.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents