Similar Projects
Uninterruptible Power Supply Monitoring, On-Site Services, and as Required Battery and Network Management Cards
Alteration
Bidding
San Jose, CA

Renewable Energy and Storage
Alteration
Bidding
Palo Alto, CA

High Voltage Testing Repair
Alteration
Post-Bid
Sunnyvale, CA

Generator Overhaul and Maintenance Services
Term Contract
Post-Bid
Santa Clara, CA 95054

Low or Medium Voltage Electrical Repairs
Term Contract, Alteration
Results
Less than $200,000 est. value
San Jose, CA

General Engineering (A License) Construction, San Francisco, San Mateo, Santa Clara, and Alameda Counties
Infrastructure, Alteration
Results
$5,000,000 est. value

Electrical Services
Term Contract
Bidding
Gilroy, CA 95020

Cooperage Emergency Generator
Alteration
Post-Bid
$709,907 est. value
San Jose, CA

CRC Battery Storage Project
Alteration
Results
$500,000 est. value
Morgan Hill, CA 95037

Stationary Generator Services
Term Contract
Post-Bid
Milpitas, San Jose, Santa Clara, CA 95050

City Hall Backup Generator
Alteration
Results
Gilroy, CA 95020

Department of Public Safety Emergency Generator Replacement
Alteration
Post-Bid
Sunnyvale, CA 94086

Battery Backup Unit Upgrades
Alteration
Results
CA

Operation and Maintenance for City-Owned Solar Systems
Term Contract
Post-Bid
Santa Clara, CA

Cubberley New Electrical Service
Alteration
Results
$200,000 est. value
Palo Alto, CA 94303

Last Updated 06/13/2022 11:39 PM
Project Title

Cubberley A and B Wings Installation of New Electrical Sub Panels

Physical Address View project details and contacts
City, State (County) Palo Alto, CA 94306   (Santa Clara County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $60,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide labor and material to install two new electrical sub-services and reconnect existing circuits to new panels. Provide labor and material to install contractor-provided wireway from 480V 3P switchgear to two new electrical panel locations. Provide labor and material required for a complete installation, including but not limited to new breakers, new raceways, wiring, transformers, and new electrical panels. Provide labor and material required for a complete installation, including but not limited to replacing existing receptacles and cover plates in A and B Wings. The contractor shall be responsible for all cutting, fitting, and patching required to complete the Work. Installation requires two electrical panels installed in each of the following electrical rooms: A 10 and B 10.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents