Similar Projects
Meacham Road Overhead Utility Line Burial - Village of Schaumburg
Infrastructure
Conception
$1,000,000 CJ est. value
Schaumburg, IL 60173

RFQ Engineering - South Edgelawn Drive at the BNSF Railway Tracks Crossing - Phase 1 Engineering Services
Infrastructure
Conception
$470,000 CJ est. value
Aurora, IL 60506

RFQ - Phase I/II Engineering Services for Reconstruction of Structure carrying IL 32/33 over I-57/70
Infrastructure
Design
$12,730,000 CJ est. value
Effingham, IL 62401

RFQ Contractor - Terminal 5 Landside and Parking Improvements - Bid Package 8
Infrastructure
Design
$200,000 CJ est. value
Chicago, IL 60666

Water Heater Replacement, Site and Building Improvements
Renovation, Infrastructure
Bidding
$595,000 CJ est. value
Barry, IL 62312

Intermittent Milling and Resurfacing, Pavement Striping, Raised Reflective Pavement Marker Removal and Replacement
Infrastructure
Bidding
$997,829 CJ est. value
Gilman, IL 60938

Sports Center Park
Post-Bid
Round Lake Beach, IL 60073

EEC Playground
Renovation
Post-Bid
Round Lake, IL 60073

Building Demolition and Site Work - AMP 3
Demolition
Results
Centreville, IL

Track and Field Rubber Surface Reconstruction
Renovation
Results
Less than $100,000 est. value
Monticello, IL 61856

Petnet - Sitework
Alteration
Construction
Elk Grove Village, IL 60007

Jackson Boulevard / Residential
New Construction, Infrastructure
Construction
$300,000 CJ est. value
Chicago, IL 60612

Learn - Hunter Perkins School Addition
Addition, Demolition, Infrastructure - 54,336 SF
Pending Verification
$2,000,000 CJ est. value
Chicago, IL 60620

T3 Goose Island
New Construction, Infrastructure - 270,000 SF
Pending Verification
$50,000,000 CJ est. value
Chicago, IL 60642

Westland Reservoir/Booster Station - Phase II - UT00502 - City of Peoria
Infrastructure
Conception
$5,450,000 CJ est. value
Peoria, IL 61603

Last Updated 08/22/2022 10:33 AM
Project Title

Winter Park Playground Poured-in-Place Rubber Surface Installation

Physical Address View project details and contacts
City, State (County) Freeport, IL 61032   (Stephenson County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Freeport Park District will accept proposals for the Winter Park Playground Poured-in-Place rubber surface installation. The Board of Park Commissioners reserves the right to waive technicalities and to reject any or all bids. In Winter Park, provide and install a specified two-layer, unitary poured-in-place rubber playground surface. Within a 6" barrier curb, the park district will provide and install an aggregate base according to contractor specification Dimensions o See drawing on page 7 o Winter Park Playground area requiring P-n-P surfacing is approximately 2865 square feet. The 825 square foot area under swings has a critical fall height of 8 feet. The 850 square foot area under a modular play structure has a fall height of 6 feet. o Wear course minimum is 1/2 " thick. Materials o Cushion Course: SBR rubber o Wear Course: EPDM o Color: Brown. Color/Blend: Wear course color selected from standard EPDM colors. o Premium grade aromatic polyurethane binder. INSTALLATION o All work shall be done in a professional manner by skilled workers and an experienced crew lead person specifically trained in the installation of poured-in-place playground surfacing. o Installation shall be done in accordance with all manufacturer's instructions and warranty limitations. o Employee vehicles not necessary to the project are to remain in the parking lor or nearest on-street parking space for vehicle parking. STANDARDS o Materials and installation to meet all current applicable ASTM and CPSC standards. o Include in submittal specifications for the proposed Materials and Installation for this project including primer, binder, adhesives, cushion layer material and wear layer materials. CLEAN UP o The contractor is responsible for protecting all property adjacent to the work from unnecessary wear and damage. o Contractor is responsible for all waste materials, empty containers and other debris and shall dispose of same off site

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents