Similar Projects
Wastewater Treatment Plant Upgrade - Contract V
Renovation
Post-Bid
$20,000,000 est. value
Nicholasville, KY

Wastewater Treatment Plant Improvements - Phase 1
Post-Bid
Middlesborough, KY

Sanitary Sewer Rehabilitation Contract 3
New Construction
Post-Bid
$1,320,000 est. value
Elkton, KY

Peracetic Acid Disinfection System Improvements
Post-Bid
Sutherland, KY 40004

Wastewater Treatment Plant and Collection System Improvements
Results
Whitesville, KY

Bells Lane WWTF Disinfection System Upgrades
Results
$50,000 to $499,999 est. value
Louisville, KY 40211

Flat Lick WWTP Replacement
Renovation
Post-Bid
$350,000 est. value
Flat Lick, KY 40935

EC McManis WWTP Headworks Improvements
Renovation
Post-Bid
Frankfort, KY 40601

West Hickman WWTP Water Strainer Replacement
Results
Lexington, KY

Wastewater Treatment Plant
Results
Less than $11,500,000 est. value
Marion, KY

200,000 Gallon Equalization Basin
Renovation
Post-Bid
$1,000,000 est. value
Dry Ridge, KY 41035

Wastewater Facilities Improvements - Contract A - Sanitary Sewer Rehab And WWTP Modifications - Contract B
Post-Bid
Dawson Springs, KY

Last Updated 10/19/2021 05:55 PM
Project Title

Replacement of Dewatering Equipment at West Hickman WWTP

Physical Address View project details and contacts
City, State (County) Nicholasville, KY 40356   (Jessamine County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

SCOPE OF WORK: The project includes providing all construction supervision, labor, materials, tools, test equipment necessary for West Hickman WWTP Solids Handling Improvements. The project includes two alternate bids. Bid alternate one include the replacement three belt filter presses with two dewatering centrifuges, three polymer blending systems, replacement of approximately 220 lf of 6” ductile buried water line, replacement of (3) 220 lf 4” ductile iron sludge lines, installation of three screw conveyors, two magnetic flow meters, all associated electrical and instrumentation, This project also includes the conversion of storage space into an office with a dedicated mini-split HVAC unit, window replacements, trolley beam demolition. The second alternate includes an additional centrifuge, conveyor, polymer blending system, magnetic flow meter, and all other associated work.

Details

Sewage Treatment Plant, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents