Similar Projects
Paving and Resurfacing of Streets
Post-Bid
Tempe, AZ 85280

Child Parent Centers Parking Lot
Renovation
Post-Bid
Tucson, AZ 85713

Job Order Contracting Services
Term Contract
Results
Less than $226,000 est. value
Flagstaff, AZ

Forest Road Repair & Const IDIQ
Results
Springerville, AZ 85938

Attesa Motorsports Complex Phase 1
New Construction
Construction
Casa Grande, AZ 85122

Rocking K South Infrastructure
New Construction - 14,500 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Tucson, AZ 85747

2019 Mill and Overlay Project
Post-Bid
Scottsdale, AZ 85256

Forest Road Heavy Repair & Const IDIQ
Results
Alpine, Clifton, AZ

Valencia East Extension
New Construction
Construction
$16,000,000 est. value
Tucson, AZ 85747

Subgrade Preparation, Road Reconditioning, Soil Stabilization, Gravel Base, Double Chip Seal and Signage
Post-Bid
Window Rock, AZ 86515

Forest Road Repair & Const IDIQ
Results
Lakeside, AZ 85929

Tuba City Shopping Center - Asphalt Parking Lot
Renovation
Construction
Tuba City, AZ 86045

Subgrade Preparation, Road Reconditioning, Gravel Base, Double Chip Seal, Culvert Installation and Signage
Post-Bid
Window Rock, AZ 86515

Forest Road Repair & Const IDIQ
Results
Overgaard, AZ 85933

CarMax - Parking Lot
New Construction
Construction
Gilbert, AZ 85297

Reported 04/14/2021 12:00 AM
Project Title

14th Avenue Street Improvements Project

Physical Address View project details and contacts
City, State (County) Safford, AZ 85546   (Graham County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Demolition and reconstruction of 14th Avenue from the Relation Street intersection to the north edge of the Stone Willow Way/Crimson Canyon Drive intersection. The finished project will include a 48-foot-wide asphaltic concrete paved road, with curb, gutter, and sidewalk on both sides. Drainage improvements include road regrading, catch basin construction, and drainage culvert installation. The pavement section includes lime stabilized soil, aggregate base course, and both 1½ and 1½ inch aggregate asphaltic concrete pavement. Lime stabilization and aggregate base course will also be placed beneath all sidewalk, curb, and gutter. The project shall include all excavation, embankment, subgrade preparation, lime stabilization, aggregate base, pavement, concrete curb, gutter, sidewalk, and patching necessary to complete the work in accordance with the project plans and specifications.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents