Similar Projects
Paving Project, 6th Avenue, Arnold AFB
Infrastructure
Design
$1,000,000 CJ est. value
Tullahoma, TN 37389

Kings Lane and Ovoca Road Sidewalk - City of Tullahoma
Infrastructure
Bidding
$310,000 CJ est. value
Tullahoma, TN 37388

Valvoline / Tullahoma
New Construction, Infrastructure - 3,763 SF
Bidding
$1,000,000 CJ est. value
Tullahoma, TN 37388

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

VTS Tullahoma Field Maintenance Shop General Purpose Bay
New Construction, Infrastructure
Post-Bid
$2,414,049 CJ est. value
Tullahoma, TN 37388

TULLAHOMA 2021 CDBG IMMINENT THREAT ROAD IMPROVEMENT
Infrastructure
Results
$595,000 CJ est. value
Tullahoma, TN 37388

VTS Tullahoma Transient Training Open Bay Barracks Phase 2
New Construction, Infrastructure
Results
$1,148,000 CJ est. value
Tullahoma, TN 37388

Chick-Fil-A / Manchester
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Manchester, TN 37355

Construction of a Welded Steel Plate Girder Bridge on U.S. 41
New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Manchester, TN 37355

Ledford Mills Gravity Sewer Extension
Infrastructure
Post-Bid
$400,000 CJ est. value
Tullahoma, TN 37388

Waite Street / SR-55 Water Main Improvements
Infrastructure
Results
$390,780 CJ est. value
Manchester, TN 37355

Grading, Drainage, Construction of a Concrete Box Beam Bridge, Lighting, Signals and Paving on S.R. 55
Infrastructure
Bidding
$25,903,581 CJ est. value
Manchester, TN 37355

TownePlace Suites
New Construction, Infrastructure
Post-Bid
$3,000,000 CJ est. value
Tullahoma, TN 37388

Hwy 55 Water Main Relocation Project
Infrastructure
Results
$2,384,565 CJ est. value
Manchester, TN 37355

Parking And Roadway Repair Motlow State Community College - Moore County Campus
Infrastructure
Bidding
$860,000 CJ est. value
Tullahoma, TN 37388

Last Updated 10/03/2023 02:02 PM
Project Title

Construction of the Ovoca Road Pump Station Replacement and Force Main addition Project

Physical Address View project details and contacts
City, State (County) Tullahoma, TN 37388   (Coffee County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $680,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Ovoca Road Pump Station Replacement and Force Main Addition The project will include the following described construction: The furnishing and installation for the proposed replacement of a Wastewater Pumping Station including bypass pumping, the removal of designated equipment and appurtenances, installation of new pumps, valves, manholes, gravity sewer piping; installation of approximately 9,600 linear feet of new 12-inch and/or 16-inch force main; external emergency pumping connection, and all other equipment and work required as shown on Contract Drawings and/or called out in the Project Specifications for which no other specific unit price or lump sum items has been established in the Bid Proposal. All qualified Disadvantaged Business Enterprises (DBE) firms desiring to bid as a General Contractor, sub-contractor, professional service provider, supplier, or equipment vendor are encouraged to contact Ms. Marilyn Robinson at the Nashville Minority Business Center office; the office of the Engineer, Water Management Services, LLC; 2 International Plaza, Suite 401; Nashville, Tennessee 37217 (telephone: 615/366-6088), in order to obtain a list of prospective bidding General Contractors or to obtain copies of bidding/contract documents. Bid documents may be examined at Builder's Exchange of Tennessee, 2322 Winford Avenue, Nashville, TN 37211, and the Nashville Minority Business Office 1919 Charlotte Avenue Suite 310 Nashville TN 37203. Tullahoma Utilities Authority reserves the right to reject any Proposal for failure to comply with all requirements of the notice or of any of the Contract Documents; however, it may waive any minor defects or informalities at its discretion Tullahoma Utilities Authority further reserves the right to reject all Proposals. The Proposal must not be removed from the Contract Documents with which it has been bound.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents