Similar Projects
Central Station Alarm Monitoring (CSAM)
Post-Bid

NCCU - The New Student Center - AV Package
Alteration
Post-Bid

Physical Security/Access Control Systems (PS/AC) Multiple Award Construction Contract (MACC)
Results
Less than $99,000,000 est. value

RFI - Home Intrusion Detection Systems
Results

Audiovisual and Multimedia Equipment, Integration-Installation, and Support Services
Term Contract, Alteration
Post-Bid
Chapel Hill, NC

Telecommunications Infrastructure Testing Services - Worldwide
Results

10Gb Ethernet IP Backbone Circuit
Term Contract
Post-Bid
Raleigh, NC - Norfolk, VA 27607

K059--CATV Fiber Optic Distribution(Analog to Digital Upgrade)
Term Contract
Results
Durham, NC 27705

10Gb Ethernet IP Backbone Circuit
Term Contract
Post-Bid
Fort Bragg, Raleigh, NC 27607

Traffic Message Board Trailers With Data Collector
Term Contract
Results
Raleigh, NC

Nationwide Alarm Maintenance and Monitoring #3
Term Contract
Post-Bid

Jace Controller Replacement
Alteration
Results
Raleigh, NC 27601

LAN CCT Campus Switches, Installation, and Professional Services
Infrastructure
Post-Bid
Bedford, Boston, MA - Chelsea, Portland, ME - Boston, New York, Syracuse, NY - Providence, RI - Hartford, VT 05047

Integrated Audiovisual Systems
Alteration
Results
$3,074,727 est. value
Chapel Hill, NC

Durham Armory AV Equipment Upgrade
Alteration
Post-Bid
Durham, NC 27701

Last Updated 07/14/2022 02:05 AM
Project Title

Lyons Farm Elem School - Security/Intrusion Detection Equipment Installation Services

Physical Address View project details and contacts
City, State (County) Durham, NC   (Durham County)
Category(s) Single Trades
Sub-Category(s) Security/Communications
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project scope: The Work at Lyons Farm Elementary School includes Telecommunications/Networking- Contractor shall provide a complete and operational system including but not limited to data racks, patch panels, copper cabling, data jacks, fiber optic cabling and all testing. The data outlet boxes in typical spaces, vertical conduit stub-ups, cable tray in corridors and conduit sleeves thru fire wall are existing as noted on the contract documents

Details

Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents