Similar Projects
Wacker and Oakton Lift Station Upgrades
Renovation
Design
Savanna, IL

Stony Ridge Chlorine Booster Station
New Construction
Bidding
Grayslake, IL

Lift Station No. 16 Improvements
Renovation
Bidding
Crystal Lake, IL 60014

Levee 37 Pump Station Upgrade (USACE Acquisition)
Post-Bid
$1,000,000 to $5,000,000 est. value
Mount Prospect, IL

Low Lift Pump
Post-Bid
Winnetka, IL

Check Valve Replacement
Results
Gurnee, IL 60031

Lift Station Upgrade
Results
$25,000 to $50,000 est. value
Greenup, IL 62428

7th Avenue Pump Station
Construction
Less than $1,250,000 est. value
Mendota, IL 61342

Cambridge on the Lake Lift Station Reconstruction
Renovation
Bidding
Buffalo Grove, IL

Mount Prospect Golf Club Irrigation Pump Station Replacement
Post-Bid
Mount Prospect, IL 60056

Force Main Improvement - Lift Station 23 and 25A
Results
Edwardsville, IL 62025

Check Valve Replacement
Renovation
Post-Bid
Gurnee, IL 60031

Oswego Pump Station Phase 2 Improvements
Results
Oswego, IL 60543

High Lift Pump 7 Replacement
Renovation
Post-Bid
Northbrook, IL

Various Repairs at Pavilion Lift Station
Results
Oakwood, IL 61858

Reported 11/05/2021 12:00 AM
Project Title

3rd Street Lift Station Sewage Grinder Cutting Head Replacement

Physical Address View project details and contacts
City, State (County) West Dundee, IL 60118   (Kane County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

A “Drop In” replacement for a channel mounted, hydraulically driven, sewage grinder cutting head. • Hydraulic power pack provides the following 1. 10 gallon reservoir 2. Positive displacement 4.5 GPM pump driven by 5HP motor. 3. 10 Micron return line filter 4. Oil level protection 5. Oil temperature protection set at 160 degrees F 6. Pressure switch set at 2,850 PSI 7. Relief valve 3000 PSI 8. Designed for idle load conditions in the 200 to 400 Psi range 9. PLC controlled; start, stop, and overload reversing features • 2015, JWC Environmental, Cartridge, Cutting Head, CMD3210-XDS2.0 • 5.5 MGD flow capacity • Single Hydraulically Driven Motor for cutter head

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents