Similar Projects
Pahala Wastewater System - Hawaii County
Renovation
Conception
$23,482,000 CJ est. value
Hilo, HI 96720

Kulaimano and Papaikou Dewatering and Barminutor Replacement - Hawaii County
Renovation
Conception
$4,300,000 CJ est. value
Hilo, HI 96720

DEM- Hilo WWTP Upgrades - County of Hawaii
Renovation
Conception
$170,000,000 CJ est. value
Hilo, HI 96720

Kamole WTP - High Lift Booster #4 Pump/motor Replacement
New Construction, Infrastructure
Post-Bid
$300,000 CJ est. value
Honolulu, HI 96813

Lihue Waste Water Treatment Plant Process Upgrades - Kauai County
Renovation
Conception
$12,500,000 CJ est. value
Lihue, HI 96766

Kamole WTP - High Lift Booster #4 Pump/motor Replacement
New Construction, Infrastructure
Post-Bid
$300,000 CJ est. value
Honolulu, HI 96813

Kihei Wastewater Reclamation Facility Grit System Replacement - CBS-5026 - Maui County
Renovation
Conception
$4,000,000 CJ est. value
Kihei, HI 96753

Lahaina Wastewater Reclamation Facility Concrete Rehabilitation - CBS-3572 - Maui County
Renovation
Conception
$500,000 CJ est. value
Lahaina, HI 96761

Lahaina Wastewater Reclamation Facility RAS/Dewatering Upgrades - CBS-3575 - Maui County
Renovation
Conception
$7,700,000 CJ est. value
Lahaina, HI 96761

Last Updated 09/29/2022 10:35 AM
Project Title

Kealakehe Wastewater Treatment Plant R-1 Upgrade - Hawaii County

Physical Address View project details and contacts
City, State (County) Kailua Kona, HI 96740   (Hawaii County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $62,679,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Upgrade to Kealakehe Wastewater Treatment Plant to producing and distributing effluent reuse for the island. Project is intended to further treat the effluent to R-1 quality and make it available for irrigation to users at nearby areas areas including the perimeter of the wastewater treatment plant, old kailua Airport (Kailua park) and areas along the way to the park. Project included R- 1 treatment and distribution, and a subsurface flow wetland and soil aquifer treatment system for the purposes of a polishing step and for nutrient removal This project is included in the county's FY 2022-2023 Capital Improvement Program. As of September 29, 2022, further details regarding design and construction timelines have not been identified. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents