Similar Projects
Seneca High School Phase 2 HVAC-A
Renovation
Sub-Bidding
$10,000 CJ est. value
Tabernacle, NJ 08088

Cherokee High School Phase 2 HVAC-A
Renovation
Sub-Bidding
$10,000 CJ est. value
Evesham, NJ 08053

HVAC & Refrigeration Replacement & Maintenance For Lukoil Service Stations
Alteration
Post-Bid

HVAC & Refrigeration Replacement & Maintenance - NJ, NY & PA / Project # 44-21
Term Contract
Post-Bid
New York, NY

Replacement of Auditorium and Cafeteria Roof Top Units at Harrington Middle School and Replacement of Multi-Purpose Room
Alteration
Results
Mount Laurel Township, NJ 08054

Bldg. 562 Air Duct Cleaning
Term Contract
Results
NJ

Shawnee High School Phase 2 HVAC-A
Renovation
Sub-Bidding
$10,000 CJ est. value
Medford, NJ 08055

HVAC - All Regions
Term Contract
Post-Bid

Districtwide Bipolar Ionization Phase 2
Alteration
Results
Burlington Township, NJ

Lenape High School Phase 2 HVAC-A
Renovation
Sub-Bidding
$10,000 CJ est. value
Medford, NJ 08055

Carslake Community Center Installation of British Thermal Unit (BTU) or Equivalent Rooftop Unit and Installation of Hydronic Wall and Ceiling Heaters
Renovation
Post-Bid
$300,000 CJ est. value
Bordentown, NJ 08505

Removal and Replacement of HVAC Equipment at Former Briggs Branch Library
Alteration
Results
Trenton, NJ

Chiller Replacement at C.B. Lamb Elementary School
Renovation
Sub-Bidding
$300,000 CJ est. value
Wrightstown, NJ 08562

HVAC-R Services
Alteration
Post-Bid
Pemberton, NJ

HVAC System Preventive Maintenance Repairs and or Replacement at Various City Facilities
Term Contract
Results
Trenton, NJ

Last Updated 01/03/2023 11:33 PM
Project Title

Beverly City School HVAC Improvements

Physical Address View project details and contacts
City, State (County) Beverly, NJ 08010   (Burlington County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $1,064,465 [brand] Estimate
Plans Available from MEP Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition of the existing drop ceiling grid and lighting system located in the Multipurpose room. Demolition of the existing through wall A/C units in the classrooms, Principal's office, Assistant Principal's office, Main office, and Nurse's office as detailed in the contract documents. a. Repair spandrel panels damaged after removing existing through wall A/C units. Demolition of the existing Air Handler Unit in the multipurpose room, exhaust fan on the roof of the multipurpose room, and all associated accessories as detailed in the contract documents. a. All roof patch work shall be in accordance with manufacturers requirements to maintain the rooftop warranty. Demolition of the existing fan coil ductwork, roof mounted condensing units, and associated accessories in the media center as detailed in the contract documents. a. All roof patch work shall be in accordance with manufacturers requirements to maintain the rooftop warranty. Demolition of the existing exhaust fans located on the roof above the maintenance office service the media center. a. All roof patch work shall be in accordance with manufacturers requirements to maintain the rooftop warranty. Installation of multi-purpose room outdoor condensing unit, indoor air handler and associated accessories. a. In the base design, the existing multi-purpose room ductwork shall be tied into the new ductwork. b. As an alternative, the roof top unit installed above the multi-purpose room may be fed from the existing gas service in place of the hydronic coil. Refer to drawings M-101A and M-501A for details on the alternate design. c. All roof patch work shall be in accordance with manufacturers requirements to maintain the rooftop warranty. Installation of A/C System, with roof mounted condensing unit and all associated accessories, to be installed above the maintenance office serving the media center. Installation of 13 new rooftop condensing units and all associated accessories as shown on the contract documents. Installation of new mini split units and outdoor air equipment to be installed at the principal's office, assistant's principal's office main office and nurse's office. Question Deadline 12/16/2022 Installation of new HVAC load center in boiler room. A new circuit breaker will be required to be installed in the main electrical panelboard located in the basement. Installation of upgraded filters on all existing unit ventilators. F. Type of Contract: Single Prime. Bidder names and proposal values will be posted to the online document portal. Bid security shall be submitted with each bid in the amount of 10 percent of the bid amount. No bids may be withdrawn for a period of 60 days after opening of bids. Owner reserves the right to reject any and all bids and to waive informalities and irregularities. Online Procurement and Contracting Documents: Obtain access after December 1st, by contacting the Engineer. Online access will be provided to all registered bidders and suppliers. Successful bidder shall begin the Work on receipt of the Notice to Proceed and shall complete the Work within the Contract Time. Work is subject to liquidated damages. Bidders must be properly licensed under the laws governing their respective trades and be able to obtain insurance and bonds required for the Work. A Performance Bond, separate Labor and Material Payment Bond, and Insurance in a form acceptable to Owner will be required of the successful Bidder. B. Bidders are required to comply with the requirements of N.J.S.A. 10:5-31 et seq. and N.J.A.C. 17:27.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents