Similar Projects
White Oak Mixed Use Development
New Construction
Conception
Houston, TX 77009

Regent Square - Phase II - Block B
New Construction - 1,042,000 SF
Conception
$100,000,000 est. value
Houston, TX 77019

Fairhaven Methodist Restroom Remodel
Renovation - 398 SF
Design
$65,000 est. value
Houston, TX 77055

Laneways Condominium and Hotel Tower A
New Construction - 556,917 SF
Design
$115,000,000 est. value
Houston, TX 77002

Cadillac Houston
New Construction
Bidding
$17,000,000 est. value
Houston, TX 77054

System Administration Parking Garage Structural Repairs
Renovation
Bidding
$425,000 to $475,000 est. value
Houston, TX 77002

United Orthodox Synagogues of Houston
Addition - 22,128 SF
Post-Bid
$6,000,000 est. value
Houston, TX 77096

Architecture and Engineering Environmental Services for The United States Air Force (Ae Es 2020)
Post-Bid

Pressler Street Garage 2 - Design Build
Results
$21,500,000 est. value
Houston, TX 77030

Comprehensive Facility and Construction Review for Fire Stations 3, 4, 5, the Emergency Training Center
Results
Spring, TX 77382

St. Anne Catholic Community
New Construction - 151,400 SF
Construction
$19,000,000 est. value
Houston, TX 77098

St. Anne Catholic Community
New Construction - 151,400 SF
Construction
$19,000,000 est. value
Houston, TX 77098

4411 San Felipe Mixed Use
New Construction
Pending Verification
Houston, TX 77027

NRG Center Interior Refresh
Renovation
Pending Verification
$7,835,543 est. value
Houston, TX 77054

Convention Center Facility Improvements
Renovation
Conception
$6,002,020 est. value
Pasadena, TX 77505

Last Updated 12/29/2021 09:12 AM
Project Title

The Ismaili Center of Houston and Parking Garage

Physical Address View project details and contacts
City, State (County) Houston, TX 77019   (Harris County)
Category(s) Education, Entertainment/Recreation, Heavy and Highway, Religious/Funeral
Sub-Category(s) Convention/Exhibit Center, Parking Garage, Religious Facility, Vocational School
Contracting Method Construction Management - CM at Risk.
Project Status Design Development, Seeking Funding
Bids Due View project details and contacts
Estimated Value $176,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

458,314 SF - Religious Facility, 4 Stories Above Grade, 150,508 SF New Construction, Vocational School, New Construction, Convention/Exhibit Center, New Construction, Parking Garage, 2 Stories Above Grade, 307,806 SF New Construction.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Ornamental Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Specialty Doors and Frames, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Telephone Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Loading Dock Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures, Religious Equipment.
Division 12 - Furnishings, Religious Art, Casework, Specialty Casework, Religious Casework, Countertops, Rugs and Mats, Office Furniture, Institutional Furniture, Classroom Furniture, Fixed Audience Seating, Pews and Benches, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents