Similar Projects
Longview Drive South Drainage Improvements-JSEB Set Aside
Bidding
Jacksonville, FL

HSDR Project Patrick Air Force Base, Mid-Reach and South Reach Segments
Post-Bid
$25,000,000 to $35,000,000 est. value
Jacksonville, FL

Roadside Ditch Cleaning and Rehabilitation - Pre-Qualified Horizontal Construction
Term Contract
Post-Bid
Jacksonville, FL 32202

Construction Engineering and Inspection Services for Old Plank Road Drainage Improvements
Results
Jacksonville, FL

Hamilton Circle Drainage Improvement Project
Results
Less than $131,916 est. value
Jacksonville, FL

Reservoir Lane Underdrain Improvement Project
Post-Bid
Jacksonville, FL 32202

Cedar Forest Drive Drainage Improvement Project
Results
Jacksonville, FL

TMT Rehab Concrete Outfall Pipe at 22+30
Post-Bid
Jacksonville, FL

Thornwood Lane Drainage Improvement Project
Results
Less than $62,577 est. value
Jacksonville, FL

Hare Avenue Drainage Improvements
Results
Less than $160,186 est. value
Jacksonville, FL

Knights Lane Outfall Improvements
Results
Less than $1,155,730 est. value
Jacksonville, FL

Clean and Desilt Box Culverts
Term Contract
Results
Less than $5,000,000 est. value
FL

Via Valencia Ditch Embankment Repair
Results
Less than $577,037 est. value
Jacksonville, FL 32099

Lilly Valley Road Drainage Improvements - JSEB Set-Aside
Results
Less than $222,186 est. value
Jacksonville, FL

Ribault Scenic Drive Bridge and Drainage Improvements
Results
Less than $125,644 est. value
Jacksonville, FL

Last Updated 09/17/2019 09:37 AM
Project Title

Spring Street Drainage Improvements

Physical Address View project details and contacts
City, State (County) Jacksonville, FL   (Duval County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $265,556
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Work consists of furnishing all labor, materials, and equipment and performing all operations necessary for construction of storm-water pond, drainage pipe, drainage structures, asphalat pavement, and water main adjustments.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents