Project Title | Sidewalk, ADA Ramps and Roadway Lighting Improvements on Business 55 |
Physical Address | View project details and contacts |
City, State (County) | Springfield, IL 62703 (Sangamon County) |
Category(s) | Heavy and Highway, Outdoor Lighting |
Sub-Category(s) | Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Results, Request for Qualifications, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $2,395,469 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 2.3 miles of sidewalk, ADA ramps and roadway lighting improvements on Business 55, IL 29 / Peoria Road from Sangamon Avenue to Ardmore Avenue in Springfield. Region 4 District 6 Federal Project # HSIPVDXW(944) County(s) Sangamon Key Route(s) FAP 666 Marked Route(s) BUS 55, IL 29/PEORIA RD Section(s) (L,27) L,SW State Job #(s) C-96-047-15 PPS #(s) 6-00553-0000 Completion Date:90 Working Days Questions not accepted as of November 08, 2022 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, October 28, 2022. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 077 - Sidewalk, Ada Ramps and Roadway Lighting Improvements on Business 55 LOCATION OF PROJECT The project limits for Peoria Road begins at the intersection with Sangamon Avenue and proceeds north to the intersection with Veterans Parkway/Peoria Road then turns east and proceeds northeast to East Ardmore Ave. The total distance is approximately 2.02 miles. DESCRIPTION OF PROJECT The proposed improvement consists of the construction of Portland cement concrete sidewalk, driveway pavement removal and reconstruction, curb and gutter removal and reconstruction, pavement marking, roadway lighting, grading, seeding, and all other work necessary to complete the project. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |