Similar Projects
Landfill Maintenance and Repair Services
Post-Bid
Camp Lejeune, NC 28547

Landfill Cells 2-6E Partial Closure Phase 3
Post-Bid
Wilmington, NC 28401

Active Gas Collection System
Results
Morganton, NC

Closed Holbrooks Road Landfill - Landfill Gas Remediation System
Results
Charlotte, NC

Landfill Recycling Area Improvements
Post-Bid
Less than $150,000 est. value
Graham, NC 27253

Landfill Gas Blower System
Results
Raleigh, NC

Landfill Gas Analyzer
Post-Bid
Raleigh, NC 27695

Cell 9 And 10A Construction
Results
Less than $4,317,314 est. value
Wilmington, NC 28401

Landfill Gas Remediation - Warren County Closed MSW Landfill
Post-Bid
NC

Solid Waste Landfill
Results
Butner, NC 27590

Construction of the Unit 1 Phase 2 Landfill Construction
Post-Bid
Dallas, NC 28034

Phases 5 and 6 Expansions of the Municipal Solid Waste (Msw) Landfill and the Horizontals Expansion of the Construction and Demolition (C&D) Landfill at Robeson County Landfill
Results
Saint Pauls, NC 28384

Implementation of the Remedial Action Plan - Hookerton Dump
Post-Bid
Hookerton, NC

MSW Landfill - Phase 6A
Results
Less than $4,756,817 est. value
Smithfield, NC 27577

Landfill Post Closure Maintenance and Repair
Post-Bid
Raleigh, NC 27614

Last Updated 05/18/2020 10:40 AM
Project Title

Francis Farm Landfill - Restrictive Cover Design Plan

Physical Address View project details and contacts
City, State (County) Waynesville, NC   (Haywood County)
Category(s) Environmental
Sub-Category(s) Landfill
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,410,581
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project generally consists of the installation of approximately 20 acres of 40-mil LLDPE cap liner system with cover soils; Earthworks to achieve final grades, totaling approximately 200,000 cubic yards of cut and fill;Extending existing LFG collection wells and replacing well heads as necessary;Replacement of LFG and leachate collection piping; The installation of a grinder pump and sewage force main;The installation of erosion control measures and stormwater conveyance features;The construction of a paved access road to the adjacent school bus maintenance facility;The installation of an access road across a stream to lower level of the property; All work in accordance with the contract documents and associated Construction Quality Assurance Plan.

Details

Division 02 - Existing Conditions, Landfill Construction and Storage.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents