Similar Projects
Smithville Road Culvert Replacement - BR-2017-009H - County of Peoria
Infrastructure
Conception
$300,000 CJ est. value
Mapleton, IL 61547

Voorhees Road Bridge Replacement - BR-2018-009H - County of Peoria
Demolition, New Construction, Infrastructure
Conception
$300,000 CJ est. value
Edwards, IL 61528

New Restroom and Site Work W. H. Sommer Park
New Construction, Infrastructure
Design
$251,000 CJ est. value
Edwards, IL 61528

Maxwell Road Bridge - BR-2017-014H - County of Peoria
Infrastructure, Renovation
Design
$2,943,132 CJ est. value
Peoria, IL 61607

Street Maintenance-Sealcoating and Fog Coating
Infrastructure
Post-Bid
Elmwood, IL

Sealcoating
Infrastructure
Post-Bid
IL

Partial Roadway Replacement - Peoria Stadium
Infrastructure
Results
Peoria, IL 61614

General Wayne A. Downing Peoria International Airport
Renovation, Infrastructure
Results
Peoria, IL

Lower Veteran's Park - Pickleball Courts
Infrastructure
Construction
$418,570 CJ est. value
Peoria, IL 61602

Lower Veteran's Park - Pickleball Courts
Infrastructure
Construction
$418,570 CJ est. value
Peoria, IL 61602

County Road 201 Remodel and Technology Upgrade - CH-19-003 - County of Peoria
Infrastructure
Conception
$350,000 CJ est. value
Peoria, IL 61603

Sealcoating
Infrastructure
Post-Bid
Laura, IL

Spring Lane and Orchard Lane Project
Infrastructure
Results
Peoria, IL 61615

Cottonwood Road Culvert Replacement - BR-2020-002H - County of Peoria
Infrastructure
Conception
$300,000 CJ est. value
Logan Township, IL 61536

30 Foot of PCBC 8 X 4 Plus Mastic Joint Compound and Joint Wrap/External Seals
Infrastructure
Post-Bid
Peoria, IL

Last Updated 04/24/2023 04:10 AM
Project Title

Bridge Deck Overlay and Scour Mitigation to SN 072-0162 Carrying IL 8

Physical Address View project details and contacts
City, State (County) Hanna City, IL 61536   (Peoria County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $523,800 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes bridge deck overlay and scour mitigation to SN 072-0162 carrying IL 8 over Walnut Creek, East of IL 78. The project improvement length is 0.058 miles. Region 3 District 4 Federal Project #HBFPSH8T(617) County(s) Peoria Key Route(s)FAS 1388 Marked Route(s)IL 8 Section(s) [(Z-4B-15D)BR]BDR,SCR State Job #(s) C-94-061-21, D-94-042-21 PPS #(s)4-07221-0500 Completion Date: 35 Working Days Questions not accepted as of February 28, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, February 17, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 042 - Bridge Deck Overlay and Scour Mitigation to SN 072-0162 Carrying IL 8 This project is located at Illinois Route 8 over Walnut Creek, just east of Illinois Route 78, in Peoria County. DESCRIPTION OF PROJECT The work on this project includes bridge deck and approach pavement scarification and microsilica overlay, inlet adjustments, riprap swales, minor scour mitigation work, replacement of existing guardrail, and all related collateral work necessary to complete the project. The Contractor shall complete the work within 35 working days.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents