Similar Projects
Scattered Site Bathroom Renovations
Renovation
Design
$200,000 CJ est. value
Louisville, KY 40272

Elevated Archery Shooting Platform
Infrastructure
Bidding
$65,942 CJ est. value
Frankfort, KY 40601

2023-B Pavement Rehabilitation
Infrastructure
Bidding
$2,000,000 CJ est. value
Louisville, KY 40209

Cement
Term Contract
Sub-Bidding
Louisville, KY 40202

Concrete Paving at Various L.M.H.A. Sites
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Louisville, KY 40202

Concrete
Alteration
Post-Bid
Murray, KY

Concrete and Flowable Fill
Alteration
Post-Bid
KY

Ready-Mixed Concrete
Infrastructure
Results
Owensboro, KY

Resurfacing and Pavement Repair on Banklick Road- Phase 1
Infrastructure
Results
$238,000 est. value
Wilder, KY 41076

Crack Sealant and Tar Pot / Kettle
Alteration
Post-Bid
Erlanger, KY

Concrete Cutting of a Door Opening
Alteration
Results
Frankfort, KY 40601

Exterior Concrete Services
Infrastructure, Alteration
Post-Bid
Richmond, KY

Donna Baker Phase II
Infrastructure, Alteration
Results
Pikeville, KY 41501

Renovation to the Robert Cherry Civic Cener
Renovation - 9,300 SF
Post-Bid
$12,239,000 CJ est. value
Paducah, KY 42001

Second Street Streetscape
Infrastructure, Alteration
Results
Pikeville, KY 41501

Last Updated 03/28/2023 05:12 PM
Project Title

New Calvary Elementary School

Physical Address View project details and contacts
City, State (County) Lebanon, KY 40033   (Marion County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $17,000,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the construction of a new replacement elementary school for 300 students to be located on the same site as the existing Calvary Elementary School. The project will be phased to accommodate the operation of the existing school facility during construction. New construction will consists of masonry load-bearing walls with steel columns and beams in some locations, steel bar joists and light gage roof trusses. Exterior building materials will include masonry veneer, metal wall panels, metal roof panels and 2-ply SBS roof system. The HVAC system will be geothermal. The existing Calvary Elementary School will be demolished upon completion and occupation of the new facility. No proposal shall be withdrawn for a period of sixty (60) days after the date of bid opening. The last date for the Architect to receive items to be addressed in any addenda is March 16, 2023 by 12:00 p.m. EDT. All requests must be submitted to the Architect in writing Note from Redlee Construction: Redlee Construction is seeking M/EBE Contractor participation. Addendum #1-#3 have been issued as of 3-20-2023.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents