Project Title

Construction Manager at Risk Diablo Stadium Improvements Project

Physical Address View project details and contacts
City, State (County) Tempe, AZ   (Maricopa County)
Category(s) Entertainment/Recreation
Sub-Category(s) Stadium
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Providing Construction Manager at Risk services for Diablo Stadium Improvements. Stage 1 of the multi-stage renovation Project for the Facility. At this point, Stage 1 is expected to include: 1. Construction of a three (3) story addition to the third base side of the Stadium to include: A two (2) story Major League Clubhouse (the parties will work jointly towards completion prior to beginning to 2022 Cactus League Spring Training season). 2. Infrastructure improvements to the seating bowl, concourse and field areas. The selected CMAR will enter into a contract to provide design phase (pre-construction) services during the design of the project and may serve as the general contractor during the construction of the project. CMAR requirements will begin with the firm providing an agency support role for the design phase (pre-construction) services and will culminate in the preparation of a GMP proposal for construction services including the solicitation of bids from pre-qualified subcontractors to perform the work. The CMAR may also compete to self-perform portions of the work. If accepted by the City and Angels, the CMAR will assume the risk of delivering the project through the GMP contract for construction and will be responsible for construction means and methods. Design Phase (pre-construction) Services by the CMAR may include: 1. Provide detailed independent cost estimating and knowledge of market conditions; 2. Provide project planning and scheduling; 3. Provide alternate systems evaluation and constructability studies; 4. Advise the City of ways to gain efficiency in project delivery; 5. Provide long-lead procurement studies and possibly initiate procurement of long-lead items; 6. Assist in the permitting process; 7. Protect the City’s sensitivity to quality, safety, and environmental factors; and 8. Prepare a guaranteed maximum price (GMP) proposal for construction of Stage 1 of the Project.

Details

Stadium, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Painting and Coating, Special Coatings.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Interior Lighting, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Audio-Video Communications.
Division 31 - Earthwork, Site Clearing, Earthwork Methods, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Athletic and Recreational Surfacing, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.