Similar Projects
Department of Criminal Justice Training New Flat Track - Kentucky Department of Criminal Justice Training
New Construction, Infrastructure
Conception
$13,024,000 est. value
Richmond, KY 40475

Construct Health Sciences Building Near Hospital - Eastern Kentucky University
New Construction, Infrastructure
Conception
$33,150,000 CJ est. value
Richmond, KY 40475

Address Pavement Condition of I-75
Infrastructure
Design
$12,000,000 CJ est. value
Richmond, KY 40475

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

New Madison Middle School Rebid
New Construction, Infrastructure
Bidding
$36,000,000 CJ est. value
Richmond, KY 40475

Pipe Insulator Services
Term Contract
Post-Bid
Richmond, KY

Pavement Markers and Reflectors
Infrastructure
Post-Bid
$600,000 CJ est. value
Richmond, KY 40475

Precision Sonar & Outdoors Expansion
Addition, Infrastructure
Pending Verification
$2,200,000 CJ est. value
Ford, KY 40475

Construct New Student Housing - Eastern Kentucky University
New Construction, Infrastructure
Conception
$19,200,000 CJ est. value
Richmond, KY 40475

Model Laboratory School Replacement - Eastern Kentucky University
New Construction, Infrastructure
Post-Bid
$90,000,000 CJ est. value
Richmond, KY 40475

Construct University Hotel and Conference Center - Eastern Kentucky University
New Construction, Infrastructure
Conception
$30,000,000 CJ est. value
Richmond, KY 40475

Transit Center Office
New Construction, Infrastructure - 18,000 SF
Post-Bid
$6,000,000 CJ est. value
Richmond, KY 40475

FEMA Site Cleanup Fort Boonesborough State Park
Infrastructure
Post-Bid
$522,250 CJ est. value
Richmond, KY 40475

Armory Park
Infrastructure
Post-Bid
$2,090,659 CJ est. value
Richmond, KY 40475

EKU Meadowbrook Farm Composting Pad
Infrastructure
Post-Bid
$200,000 CJ est. value
Richmond, KY 40475

Last Updated 03/10/2023 12:01 AM
Project Title

Burnam Hall Sewer Project

Physical Address View project details and contacts
City, State (County) Richmond, KY 40475   (Madison County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $97,090 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

- Project Start Date: 5/15/2023 - Substantial Date for Completion: 7/21/2023 - Final Date for Completion: 8/4/2023 Liquidated Damages: - $200 until Substantial Completion - $100 until Final Completion Bid bond, payment and performance bonds are required. This invitation is for construction work near Burnam Hall as specified in the following bid at Eastern Kentucky Universitys Richmond Campus. The work includes furnishing all labor, materials, equipment and services necessary for the complete project including all items as indicated throughout the event and attached specifications. Work will begin immediately following an official Award of Contract and Purchase Order from Eastern Kentucky University. A point of contact for EKU Project Management will be provided to the awarded vendor at time of award. Eastern Kentucky University reserves the right to award in part or in whole and to award multiple suppliers/contracts if in the best interest of the university. Question Submission Close Date 2/20/2023 4:00 PM EST The project is best described in 3 sections. The first section is the relocation of a 4 inch sanitary line. The line currently runs under a the Burnam Hall. The project will relocate the line to be out from under the vestibule. Building roof drains will be raised to eliminate conflicts. The second section relocates an existing 8 inch gravity sewer away from tree roots. An existing manhole will be replaced. 8 inch sanitary will be extended from the replaced manhole and two new manholes installed, with one being an external drop manhole cut into an existing sanitary line. The third section separates storm water and sanitary sewer interconnections. An 8 inch storm line shall be intercepted prior to the interconnection to sanitary and a new line will be extended to connect to the closest available storm sewer. Two manholes will be placed. A new curb inlet will be installed. A portion of the new line will be 8 inch and the other will be 15 inch. The project will also include milling and paving of the Eastern portion of the parking lot that the new sanitary and storm lines will be disturbing as well as some curb replacement.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents