Similar Projects
Educational Science and Horticulture Site Utility Replacements - GPC
Infrastructure, Alteration
Bidding
$1,600,000 est. value
Madison, WI

2022 Sanitary and Water Lateral Reconstruction Plank Road and Midway Road
Infrastructure
Bidding
$1,132,000 est. value
Neenah, WI 54956

Storm Main Repair
Post-Bid
Tomah, WI

2021 Lateral Replacement
Post-Bid
Two Rivers, WI

Perry to Newman 36-Inch Transmission Water Main
Results
Less than $11,000,000 est. value
Racine, WI 53406

Central Campus Utilities - General
Results
Less than $3,000,000 est. value
Whitewater, WI 53190

Outfall Backflow Prevention
Infrastructure
Bidding
Milwaukee, WI

Forest Avenue Reconstruction
Post-Bid
West Bend, WI

Waukesha Water Utility - Contract Package 2B
Results
Waukesha, WI

2022 Labansky Subdivision, Public Street & Utility Reconstruction
Infrastructure
Bidding
Reedsburg, WI 53959

DPW Sewer and Water Mains
Post-Bid
Milwaukee, WI 53288

Utility Structure Rehabilitation and Replacement
Results
$1,550,000 est. value
Janesville, WI

2022 Sanitary and Water Main Replacement - North Avenue
Infrastructure
Bidding
Little Chute, WI 54140

2021 Kansas Street - Street and Utility Improvements
Post-Bid
Horicon, WI 53032

Rockstream Drive Assesssment District - 2020
Results
Less than $2,136,420 est. value
Madison, WI 53719

Last Updated 03/23/2022 12:28 PM
Project Title

Villa Louis Road Water Main Improvements

Physical Address View project details and contacts
City, State (County) Prairie du Chien, WI 53821   (Crawford County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $375,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Villa Louis Road Water Main Improvements - to include: construction of 4,110 feet of 6" water main, 38 LF of 8" water main, 7 hydrants, water valves, and water services. The water main will be installed on the side of the road, other than replacement as required for water main crossings. The street replacement beyond patches for crossings is not included in the scope of the project, restoration of the work area, and other miscellaneous items in conformance with the Contract Documents.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents