Similar Projects
Blue Ridge Parkway
Post-Bid
$85,000,000 est. value

Kerners Mill Creek Greenway
Post-Bid
Less than $1,742,000 est. value
Kernersville, NC

Meadowlark Drive Widening
Results
Winston-Salem, NC

Paving of Certain Village Streets
Results
$1,294,417 est. value
Clemmons, NC 27012

Reynolda Crosswalk at Graylyn
Renovation
Construction
Winston-Salem, NC 27105

Bituminous Plant Mix Asphalt
Term Contract
Post-Bid

1st and 2nd Street Two-Way Conversion
Results
Winston-Salem, NC 27102

Williams Road Gateway Project
Infrastructure
Post-Bid
Lewisville, NC

Pavement and Structure Rehabilitation
Results
NC

Meadowlark Elementary And Middle School Traffic Circulation Improvements
Infrastructure
Post-Bid
Winston-Salem, NC 27106

Asphalt Surface Treatment
Results
NC

Paving of Certain Village Streets
Infrastructure
Post-Bid
Clemmons, NC

Milling, Resurfacing and Shoulder Grading
Results
NC

Concrete/Asphalt/Bridge Deck Joint Repairs and Roadways, Crack Sealing, Asphalt Milling and Foam Injections
Results

Surfacing, Resurfacing, Pavement Repair, Pavement Markings on Various Routes, on an "As Needed Basis"
Results

Last Updated 12/22/2021 01:39 AM
Project Title

Grading, Drainage, Paving, and Structure.

Physical Address View project details and contacts
City, State (County) NC   (Forsyth County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Future i-74 (Winston-Salem Northern Beltway) From i-40 To i-40 Bus/Us 421. Lump Sum Ls Mobilization Lump Sum Ls Construction Surveying Lump Sum Ls Clearing & Grubbing .. Acre(s) 5 Acr Supplementary Clearing & Grubbing 3,192,000 Cy Unclassified Excavation Lump Sum Ls Type i Standard Approach Fill Station ********** (22+26.35 -y1b-) Lump Sum Ls Type i Standard Approach Fill Station ********** (23+43.03 -y16-) Lump Sum Ls Type i Standard Approach Fill Station ********** (47+28.33 -y15rev-) Lump Sum Ls Type i Standard Approach Fill Station ********** (47+63.62 -y15flybd-) Lump Sum Ls Type i Standard Approach Fill Station ********** (58+33.94 -y15flyca-) Lump Sum Ls Type i Standard Approach Fill Station ********** (60+66.06 -y15flyac-) Lump Sum Ls Type Iii Reinforced Approach Fill, Station ******* (30+67.66 -y4-) 10,000 Cy Undercut Excavation 4 Ea Embankment Settlement Gauges 162,460 Cy Drainage Ditch Excavation 6,820 Lf Berm Ditch Construction 64,350 Sy Removal Of Existing Asphalt Pavement 75,130 Sy Removal Of Existing Concrete Pavement 16,650 Sy Breaking Of Existing Asphalt Pavement 9,630 Sy Breaking Of Existing Concrete Pavement 120 Hr Proof Rolling 28,900 Cy Select Granular Material, Class Iii 10,000 Cy Select Granular Material 74,600 Sy Geotextile For Soil Stabilization 500 Ton Generic Grading Item Hauling And Disposal Of Petroleum Contaminated Soil 7,124 Ton Foundation Conditioning Material, Minor Structures 25,560 Sy Foundation Conditioning Geotextile 1,416 Lf 15" Side Drain Pipe 344 Lf 18" Side Drain Pipe 362 Lf ***" Rc Pipe Culverts, Class ***** (42", v) 292 Lf ***" Rc Pipe Culverts, Class ***** (54", v) 620 Lf ***" Rc Pipe Culverts, Class ***** (60", v) 124 Lf 12" Rc Pipe Culverts, Class Iii 9,040 Lf 15" Rc Pipe Culverts, Class Iii 12,832 Lf 18" Rc Pipe Culverts, Class Iii 6,288 Lf 24" Rc Pipe Culverts, Class Iii 3,838 Lf 30" Rc Pipe Culverts, Class Iii 2,832 Lf 36" Rc Pipe Culverts, Class Iii 1,756 Lf 42" Rc Pipe Culverts, Class Iii 704 Lf 48" Rc Pipe Culverts, Class Iii 212 Lf 54" Rc Pipe Culverts, Class Iii 744 Lf 60" Rc Pipe Culverts, Class Iii 56 Lf 72" Rc Pipe Culverts, Class Iii 168 Lf ****" Rc Pipe Culverts, Class Iv (48") 292 Lf ****" Rc Pipe Culverts, Class Iv (54") 360 Lf ****" Rc Pipe Culverts, Class Iv (60") 4,348 Lf 15" Rc Pipe Culverts, Class Iv 2,932 Lf 18" Rc Pipe Culverts, Class Iv 1,232 Lf 24" Rc Pipe Culverts, Class Iv 92 Lf 30" Rc Pipe Culverts, Class Iv 784 Lf 36" Rc Pipe Culverts, Class Iv 348 Lf 42" Rc Pipe Culverts, Class Iv 164 Lf **" Cs Pipe Culverts, *****" Thick (36", 0.079") 80 Lf **" Cs Pipe Culverts, *****" Thick (42", 0.109") 2,390 Lf 15" Cs Pipe Culverts, 0.064" Thick 688 Lf 18" Cs Pipe Culverts, 0.064" Thick 752 Lf 24" Cs Pipe Culverts, 0.064" Thick 580 Lf 30" Cs Pipe Culverts, 0.079" Thick 86 Ea **" Cs Pipe Elbows, *****" Thick (15", 0.064") 26 Ea **" Cs Pipe Elbows, *****" Thick (18", 0.064") 20 Ea **" Cs Pipe Elbows, *****" Thick (24", 0.064") 18 Ea **" Cs Pipe Elbows, *****" Thick (30", 0.079") 2 Ea **" Cs Pipe Elbows, *****" Thick (36", 0.079") 2 Ea **" Cs Pipe Elbows, *****" Thick (42", 0.109") 54 Lf **" Welded Steel Pipe, ****" Thick, Grade b In Soil (24", 0.375") 102 Lf **" Welded Steel Pipe, ****" Thick, Grade b In Soil (30", 0.375") 192 Lf **" Welded Steel Pipe, ****" Thick, Grade b In Soil (42", 0.500") 114 Lf **" Welded Steel Pipe, ****" Thick, Grade b In Soil (48", 0.500") 54 Lf **" Welded Steel Pipe, ****" Thick, Grade b Not In Soil (24", 0.375") 102 Lf **" Welded Steel Pipe, ****" Thick, Grade b Not In Soil (30", 0.375") 192 Lf **" Welded Steel Pipe, ****" Thick, Grade b Not In Soil (42", 0.500") 114 Lf **" Welded Steel Pipe, ****" Thick, Grade b Not In Soil (48", 0.500") 14,480 Lf Pipe Removal 10 Ea Pipe Clean Out Lump Sum Ls Fine Grading 20 Ton #57 Stone 8,000 Cy Shallow Undercut 98,565 Ton Class Iv Subgrade Stabilization 500 Ton Stabilizer Aggregate 9,500 Ton Class Iv Aggregate Stabilization 187,400 Sy Geotextile For Pavement Stabilization 15,800 Ton Aggregate Base Course 1,000 Ton Incidental Stone Base 21,700 Cy Shoulder Borrow 6,216 Gal Prime Coat 3,520 Sy Incidental Milling 139,930 Ton Asphalt Conc Base Course, Type b25.0c 94,040 Ton Asphalt Conc Intermediate Course, Type i19.0c 50,950 Ton Asphalt Conc Surface Course, Type s9.5b 38,290 Ton Asphalt Conc Surface Course, Type s9.5c 16,525 Ton Asphalt Binder For Plant Mix 1,355 Ton Asphalt Plant Mix, Pavement Repair 1,250 Sy Repair Of Jointed Concrete Pavement Slabs 50 Ton Select Material, Class Iv 57,550 Lf Milled Rumble Strips (Asphalt Concrete) 132,215 Sy *****" Port Cem Conc Pavement, Through Lanes (With Dowels) (12") 9,980 Sy *****" Port Cem Conc Pavement, Ramps (With Dowels) (12") 3,470 Sy *****" Port Cem Conc Pavement, Miscellaneous (Without Dowels) (12") 380 Sy Generic Paving Item 7" Jointed Concrete Truck Apron 45,730 Sy Generic Paving Item Diamond Grinding Pcc Pavement 75,440 Sy Concrete Shoulders Adjacent To ******" Pavement (12") Lump Sum Ls Field Laboratory Rental, Port Cem Conc Pavement 60,240 Lf Milled Rumble Strips (Concrete Shoulders) 278 Ea Right-Of-Way Markers 8 Ea Control-Of-Access Markers 5,174.4 Cy Subdrain Excavation 15,400 Sy Geotextile For Subsurface Drains 2,587.2 Cy Subdrain Coarse Aggregate 15,400 Lf 6" Perforated Subdrain Pipe 31 Ea Subdrain Pipe Outlet 186 Lf 6" Outlet Pipe 22,060 Lf Shoulder Drain 22,060 Lf 4" Shoulder Drain Pipe 1,780 Lf 4" Outlet Pipe For Shoulder Drains 40 Ea Concrete Pad For Shoulder Drain Pipe Outlet 20 Ton Blotting Sand 56.374 Cy Endwalls 50 Cy Reinforced Endwalls 21.554 Cy Pipe Collars 31 Cy Flowable Fill 502 Ea Masonry Drainage Structures 96.64 Cy Masonry Drainage Structures 518.6 Lf Masonry Drainage Structures 4 Ea Frame With Grate, Std 840.22 19 Ea Frame With Two Grates, Std 840.16 106 Ea Frame With Two Grates, Std 840.20 176 Ea Frame With Two Grates, Std 840.22 4 Ea Frame With Two Grates, Std 840.24 7 Ea Frame With Grate & Hood, Std 840.03, Type ** (e) 45 Ea Frame With Grate & Hood, Std 840.03, Type ** (f) 46 Ea Frame With Grate & Hood, Std 840.03, Type ** (g) 44 Ea Frame With Cover, Std 840.54 69 Ea Steel Frame With Two Grates, Std 840.37 6 Ea Concrete Transitional Section For Drop Inlet 2 Ea Generic Drainage Item Outlet Control Stucture 3,290 Lf 1'-6" Concrete Curb & Gutter 13,160 Lf 2'-6" Concrete Curb & Gutter 10,080 Lf Shoulder Berm Gutter 550 Lf Concrete Expressway Gutter 2,550 Sy 4" Concrete Sidewalk 33 Ea Concrete Curb Ramps 1,200 Sy 6" Concrete Driveway 390 Sy 4" Concrete Paved Ditch 6,020 Sy 4" Concrete Island Cover 1,350 Sy 5" Monolithic Concrete Islands (Keyed In) 20 Sy **" Monolithic Concrete Median (*****) (8", Non-Mountable) 9,670 Lf Concrete Barrier, Type ******* (t) 1,850 Lf Concrete Barrier, Type ******* (t1) 2,750 Lf Concrete Barrier, Type ******* (t2) 9 Ea Concrete Barrier Transition Section 17,520 Lf Precast Reinforced Concrete Barrier, Single Faced 270 Sy Generic Paving Item Fill And Cap Behind Barrier 230 Lf Generic Paving Item 2'-0" Modified Valley Gutter 710 Lf Generic Paving Item Ddi Barrier 4 Ea Generic Paving Item Median Hazard Protection 2 Ea Adjustment Of Drop Inlets 1 Ea Convert Existing Catch Basin To Junction Box 6 Ea Convert Existing Drop Inlet To Junction Box 53,000 Lf Steel Beam Guardrail 150 Lf Steel Beam Guardrail, Shop Curved 10 Ea Additional Guardrail Posts 1 Ea Guardrail Anchor Units, Type ************ (b-77 Modified) 51 Ea Guardrail End Units, Type Cat-1 8 Ea Guardrail Anchor Units, Type Iii 52 Ea Guardrail End Units, Type Tl-3 13 Ea Guardrail End Units, Type Tl-2 30 Ea Guardrail Anchor Units, Type b-77 8,650 Lf Remove Existing Guardrail 15,390 Lf Remove Existing Guiderail 2,950 Lf Temporary Steel Beam Guardrail 10 Ea Temporary Guardrail End Units, Type ***** (Tl-2) 1,300 Lf Double Faced Cable Guiderail 5 Ea Additional Guiderail Posts 1 Ea Cable Guiderail Anchor Units 51,900 Lf Woven Wire Fence, 47" Fabric 3,256 Ea 4" Timber Fence Posts, 7'-6" Long 825 Ea 5" Timber Fence Posts, 8'-0" Long 3,230 Lf ** Strand Barbed Wire Fence With Posts (5) 6 Ea Single Gates, **" High, **' Wide, **' Opening (47", 12', 12') 8,220 Ton Rip Rap, Class i 210 Ton Rip Rap, Class Ii 10 Ton Rip Rap, Class a 4,780 Ton Rip Rap, Class b 40 Ton Boulders 35,825 Sy Geotextile For Drainage 11 Ea Preformed Scour Holes With Level Spreader Apron 15 Cy Reinforced Concrete Sign Foundations 3 Cy Plain Concrete Sign Foundations 727 Cy Overhead Footing 15,077 Lb Supports, Breakaway Steel Beam 4,418 Lb Supports, Simple Steel Beam 4,723 Lf Supports, 3-Lb Steel u-Channel 14 Ea Supports, 2-Lb Steel u-Channel Lump Sum Ls Supports, Overhead Sign Structure At Sta ****** (155+88 -y15-) Lump Sum Ls Supports, Overhead Sign Structure At Sta ****** (160+00 -y15-) Lump Sum Ls Supports, Overhead Sign Structure At Sta ****** (160+85 -y15-) Lump Sum Ls Supports, Overhead Sign Structure At Sta ****** (17+50 -y15rev-) Lump Sum Ls Supports, Overhead Sign Structure At Sta ****** (20+87 -y4-) Lump Sum Ls Supports, Overhead Sign Structure At Sta ****** (24+50 -y15-) Lump Sum Ls Supports, Overhead Sign Structure At Sta ****** (26+00 -y4-) Lump Sum Ls Supports, Overhead Sign Structure At Sta ****** (26+37 -y15flybd-) Lump Sum Ls Supports, Overhead Sign Structure At Sta ****** (29+41 -y4-) Lump Sum Ls Supports, Overhead Sign Structure At Sta ****** (31+94 -y4-) Lump Sum Ls Supports, Overhead Sign Structure At Sta ****** (32+00 -y15-) Lump Sum Ls Supports, Overhead Sign Structure At Sta ****** (32+00 -y15flyac-) Lump Sum Ls Supports, Overhead Sign Structure At Sta ****** (34+68 -y15flyca-) Lump Sum Ls Supports, Overhead Sign Structure At Sta ****** (47+00 -y15flyac-) Lump Sum Ls Supports, Overhead Sign Structure At Sta ****** (50+46 -y15-) Lump Sum Ls Supports, Overhead Sign Structure At Sta ****** (52+00 -y15flyca-) Lump Sum Ls Supports, Overhead Sign Structure At Sta ****** (56+00 -y15rev-) Lump Sum Ls Supports, Overhead Sign Structure At Sta ****** (666+00 -l-) Lump Sum Ls Supports, Overhead Sign Structure At Sta ****** (686+00 -l-) Lump Sum Ls Supports, Overhead Sign Structure At Sta ****** (702+30 -l-) Lump Sum Ls Supports, Overhead Sign Structure At Sta ****** (706+00 -l-) Lump Sum Ls Supports, Overhead Sign Structure At Sta ****** (737+50 -l- Eb) Lump Sum Ls Supports, Overhead Sign Structure At Sta ****** (737+50 -l- Wb) Lump Sum Ls Supports, Overhead Sign Structure At Sta ****** (757+00 -l-) Lump Sum Ls Supports, Overhead Sign Structure At Sta ****** (76+25 -y15flybd-) Lump Sum Ls Supports, Overhead Sign Structure At Sta ****** (763+84 -l-) Lump Sum Ls Supports, Overhead Sign Structure At Sta ****** (794+00 -l-) Lump Sum Ls Supports, Overhead Sign Structure At Sta ****** (819+00 -l-) Lump Sum Ls Supports, Overhead Sign Structure At Sta ****** (826+00 -l-) Lump Sum Ls Supports, Overhead Sign Structure At Sta ****** (835+50 -l-) Lump Sum Ls Supports, Overhead Sign Structure At Sta ****** (89+70 -y15rev-) Lump Sum Ls Supports, Overhead Sign Structure At Sta ****** (91+50 -y15rev-) 7 Ea Sign Erection, Type d 255 Ea Sign Erection, Type e 7 Ea Sign Erection, Type f 56 Ea Sign Erection, Type *** (Overhead) (a) 29 Ea Sign Erection, Type *** (Overhead) (b) 18 Ea Sign Erection, Type *** (Ground Mounted) (a) 2 Ea Sign Erection, Type *** (Ground Mounted) (b) 12 Ea Sign Erection, Milemarkers 3 Ea Sign Erection, Relocate Type **** (Ground Mounted) (a) 6 Ea Disposal Of Support, Steel Beam 5 Ea Disposal Of Sign System, Steel Beam 33 Ea Disposal Of Sign System, Uchannel 562 Sf Work Zone Signs (Stationary) 2,452 Sf High Visibility Stationary Signs 565 Sf Work Zone Signs (Portable) 16 Sf High Visibility Portable Signs 380 Sf Work Zone Signs (Barricade Mounted) 8 Ea Flashing Arrow Board 10 Ea Portable Changeable Message Sign 10 Ea Work Zone Digital Speed Limit Signs 56 Ea Work Zone Presence Lighting 410 Ea Drums 510 Ea High Visibility Drums 60 Ea Sequential Flashing Warning Lights 74 Ea Cones 936 Lf Barricades (Type Iii) 45 Lf Pedestrian Channelizing Devices 106 Day Flagger 9 Ea Temporary Crash Cushions 14 Ea Remove & Reset Temporary Crash Cushion 6 Ea Tma 31,326 Lf Portable Concrete Barrier 250 Lf Portable Concrete Barrier (Anchored) 45,830 Lf Remove And Reset Portable Concrete Barrier 64 Hr Law Enforcement 4,977 Lf Temporary Glare Screen 9 Ea Generic Traffic Control Item Audible Warning Devices 8 Ea Generic Traffic Control Item Connected Lane Closure Device 2 Ea Generic Traffic Control Item Flashing Beacon And Detection System 3,165 Ea Temporary Raised Pavement Markers 44,152 Lf Thermoplastic Pavement Marking Lines (4", 90 Mils) 156,846 Lf Thermoplastic Pavement Marking Lines (6", 90 Mils) 2,728 Lf Thermoplastic Pavement Marking Lines (8", 90 Mils) 18,414 Lf Thermoplastic Pavement Marking Lines (12", 90 Mils) 108 Ea Thermoplastic Pavement Marking Character (90 Mils) 288 Ea Thermoplastic Pavement Marking Symbol (90 Mils) 1,646 Lf Cold Applied Plastic Pavement Marking Lines, Type ** (6") (Iv) 1,632 Lf Cold Applied Plastic Pavement Marking Lines, Type ** (12") (Iv) 200,932 Lf Paint Pavement Marking Lines (4") 7,767 Lf Paint Pavement Marking Lines (8") 134 Lf Paint Pavement Marking Lines (12") 4,594 Lf Paint Pavement Marking Lines (24") 60 Ea Paint Pavement Marking Character 465 Ea Paint Pavement Marking Symbol 268,270 Lf Work Zone Performance Pavement Marking Lines, 6" 9,332 Lf Work Zone Performance Pavement Marking Lines, 12" 22,125 Lf Removal Of Pavement Marking Lines (4") 164,490 Lf Removal Of Pavement Marking Lines (6") 490 Lf Removal Of Pavement Marking Lines (8") 3,829 Lf Removal Of Pavement Marking Lines (12") 319 Lf Removal Of Pavement Marking Lines (24") 27 Ea Removal Of Pavement Marking Symbols & Characters 13,967 Lf Generic Pavement Marking Item Polyurea Pavement Marking Lines, 12" 30 Mils (Standard Glass Beads) 4,479 Lf Generic Pavement Marking Item Polyurea Pavement Marking Lines, 4", 30 Mils (Standard Glass Beads) 138,443 Lf Generic Pavement Marking Item Polyurea Pavement Marking Lines, 6", 30 Mils (Standard Glass Beads) 124 Lf Generic Pavement Marking Item Polyurea Pavement Marking Lines, 8", 30 Mils (Standard Glass Beads) 1,989 Lf Generic Pavement Marking Item Thermoplastic Pavement Marking Lines (24", 90 Mils) 4,352 Ea Generic Pavement Marking Item Non-Cast Iron Snowplowable Pavement Marker 145 Ea Permanent Raised Pavement Markers 3 Ea 100' High Mount Standard 1 Ea Portable Drive Unit 21 Cy High Mount Foundations 18 Ea High Mount Luminaires ******** (560w Led) 13 Ea Light Standards, Type Mtlt ************ (45' Sa, 15' Arm) 8 Ea Light Standards, Type Mtlt ************ (45' Ta, 15' Arm) 19 Ea Standard Foundation ********* (Type r1) 2 Ea Standard Foundation ********* (Type r2) 29 Ea Light Standard Luminaires, Type ************ (Rdw, 285w Led) 1 Ea Electric Service Pole **** ******** (30' Class 4) 25 Lf Electric Service Lateral ************ (3 1/0 Use) 1 Ea Light Control Equipment, Type Rw ************ (240/480 v) 470 Lf Electrical Duct, Type Bd, Size ***** (2") 655 Lf Electrical Duct, Type Ja, Size ***** (3") 315 Lf Electrical Duct, Type Ja, Size ***** (4") 460 Lf ** #8 w/g Feeder Circuit (2) 600 Lf ** #6 w/g Feeder Circuit (2) 190 Lf ** #4 w/g Feeder Circuit (2) 5,230 Lf ** #8 w/g Feeder Circuit In *****" Conduit (2, 1.5") 3,040 Lf ** #6 w/g Feeder Circuit In *****" Conduit (2, 1.5") 2,635 Lf ** #4 w/g Feeder Circuit In *****" Conduit (2, 1.5") 1 Ea Electrical Junction Boxes ************ (Cs36) 3 Ea Electrical Junction Boxes ************ (Hm18) 13 Ea Electrical Junction Boxes ************ (Ig18) 5 Ea Electrical Junction Boxes ************ (Ig30) 19 Ea Electrical Junction Boxes ************ (Ls18) 2 Ea Electrical Junction Boxes ************ (Ls30) Lump Sum Ls Portable Lighting 1,303 Lf **" Water Line (36") 271 Lf 2" Water Line 5,887 Lf 6" Water Line 35 Lf 12" Water Line 41,890 Lb Ductile Iron Water Pipe Fittings 41 Ea 6" Valve 1 Ea 12" Valve 1 Ea 6" Tapping Sleeve & Valve 1 Ea **" Blow Off (3/4") 48 Ea Relocate Water Meter 4 Ea Reconnect Water Meter 24 Ea Fire Hydrant 1 Ea Relocate Fire Hydrant 503 Lf Fire Hydrant Leg 1 Ea 6" Line Stop 1 Ea 12" Line Stop 2,465 Lf Water Service Line 8,921 Lf 8" Sanitary Gravity Sewer 1,586 Lf 16" Sanitary Gravity Sewer 21 Ea Sanitary Sewer Clean-Out 1,240 Lf Sewer Service Line 40 Ea 4' Dia Utility Manhole 18 Ea 5' Dia Utility Manhole 4 Ea 6' Dia Utility Manhole 222 Lf Utility Manhole Wall 4' Dia 190 Lf Utility Manhole Wall 5' Dia 12 Lf Utility Manhole Wall 6' Dia 1,565 Lf Abandon **" Utility Pipe (15") 410 Lf Abandon **" Utility Pipe (36") 5,100 Lf Abandon 8" Utility Pipe 391 Lf Abandon 18" Utility Pipe 373 Ea Remove Water Meter 49 Ea Remove Fire Hydrant 102 Ea Abandon Utility Manhole 5 Ea Remove Utility Manhole 330 Lf **" Encasement Pipe (54") 1,340 Lf 18" Encasement Pipe 360 Lf 30" Encasement Pipe 885 Lf Bore And Jack Of **" (18") 1 Ea Generic Utility Item 36" x 6" Tapping Sleeve And Valve 1 Ea Generic Utility Item 4" Combination Air Valve In Mh 3 Ea Generic Utility Item Steel Pile Pier 242,460 Lf Temporary Silt Fence 9,325 Ton Stone For Erosion Control, Class a 44,570 Ton Stone For Erosion Control, Class b 25,840 Ton Sediment Control Stone 1,404.5 Acr Temporary Mulching 54,100 Lb Seed For Temporary Seeding 270.5 Ton Fertilizer For Temporary Seeding 24,585 Lf Temporary Slope Drains 5,640 Lf Safety Fence 206,860 Cy Silt Excavation 771,880 Sy Matting For Erosion Control 1,515 Sy Coir Fiber Mat 18,500 Sy Permanent Soil Reinforcement Mat 40,410 Lf 1/4" Hardware Cloth 150 Lf **" Temporary Pipe (15") 100 Lf Temporary Pipe For Stream Crossing 165 Sy Floating Turbidity Curtain 1,016 Cy Stilling Basins 13 Ea Special Stilling Basins 1,530 Lf Wattle 9,400 Lf Coir Fiber Wattle 28,290 Lf Wattle Barrier 14,635 Lb Polyacrylamide (Pam) 29,710 Lf Coir Fiber Baffle 58 Ea **" Skimmer (1-1/2") 29 Ea **" Skimmer (2") 8 Ea **" Skimmer (2-1/2") 5 Ea **" Skimmer (3") 1 Ea **" Skimmer (4") 747 Acr Seeding & Mulching 858 Acr Mowing 14,250 Lb Seed For Repair Seeding 36.75 Ton Fertilizer For Repair Seeding 18,275 Lb Seed For Supplemental Seeding 548 Ton Fertilizer Topdressing 1,090 Lf Impervious Dike 290 Mhr Specialized Hand Mowing 150 Ea Response For Erosion Control 2,650 Ea Concrete Washout Structure 11 Cy Culvert Diversion Channel 34 Acr Reforestation 185 Ea Generic Erosion Control Item Fabric Insert Inlet Protection Device 553 Ea Generic Erosion Control Item Fabric Insert Inlet Protection Device Cleanout 16 Ea Pedestrian Signal Head (16", 1 Section w/Countdown) 15,050 Lf Signal Cable 72 Ea Vehicle Signal Head (12", 3 Section) 7 Ea Vehicle Signal Head (12", 4 Section) 10 Ea Vehicle Signal Head (12", 5 Section) 4,600 Lf Messenger Cable (1/4") 2,925 Lf Messenger Cable (3/8") 35,406 Lf Tracer Wire 25 Lf Paved Trenching (***********) (1, 2") 4,271 Lf Unpaved Trenching (**********) (1, 2") 28,788 Lf Unpaved Trenching (**********) (2, 2") 2,530 Lf Unpaved Trenching (**********) (3, 2") 440 Lf Unpaved Trenching (**********) (4, 2") 1,375 Lf Directional Drill (**********) (1, 2") 2,354 Lf Directional Drill (**********) (2, 2") 594 Lf Directional Drill (**********) (3, 2") 98 Ea Junction Box (Standard Size) 75 Ea Junction Box (Over-Sized, Heavy Duty) 23 Ea Wood Pole 23 Ea Guy Assembly 11 Ea ***" Riser With ************** (1-1/2", Weatherhead) 2 Ea 1" Riser With Weatherhead 2 Ea 2" Riser With Weatherhead 5,625 Lf Inductive Loop Sawcut 13,700 Lf Lead-In Cable (************) (14-2) 2 Ea Site Survey 4 Ea Luminaire Arm For Video System 8 Ea Camera Without Internal Loop Emulator Processing Unit 2 Ea External Loop Emulator Processing Unit 8 Ea Relocate Camera Sensor Unit 21,534 Lf Communications Cable (**Fiber) (144) 830 Lf Communications Cable (**Fiber) (24) 5,425 Lf Communications Cable (**Fiber) (36) 21,055 Lf Communications Cable (**Fiber) (72) 5,271 Lf Drop Cable 19 Ea Splice Enclosure 21 Ea Interconnect Center 87 Ea Delineator Marker 4,900 Lf Remove Existing Communications Cable 8 Ea Metal Strain Signal Pole 6 Ea Metal Pole With Single Mast Arm 21 Ea Soil Test 95 Cy Drilled Pier Foundation 6 Ea Mast Arm With Metal Pole Design 25 Ea Sign For Signals 18 Ea Type Ii Pedestal With Foundation 4 Ea Signal Cabinet Foundation 4 Ea Controllers With Cabinet (************************) (Type 2070e, Base Mounted) 32 Ea Detector Card (Type 170) 4 Ea Cabinet Base Extender 1 Ea Traffic Signal Removal 66 Ea Generic Signal Item 5/8" x 10' Grounding Electrode 7 Ea Generic Signal Item Cctv Metal Pole (60') 8 Ea Generic Signal Item Digital Cctv Camera Assembly 5 Ea Generic Signal Item Dms Access Ladder 5 Ea Generic Signal Item Dms Pedestal Structure 5 Ea Generic Signal Item Dynamic Message Sign (Type-2c) 11 Ea Generic Signal Item Equipment Cabinet Disconnect 17 Ea Generic Signal Item Ethernet Edge Switch 8 Ea Generic Signal Item Field Equipment Cabinet 1 Ea Generic Signal Item Hub Cabinet 1 Ea Generic Signal Item Hub Cabinet Base Extender 1 Ea Generic Signal Item Hub Cabinet Foundation 12 Ea Generic Signal Item Junction Box (Special Oversized) 11 Ea Generic Signal Item Meter Base/Disconnect Combination Panel 1 Ea Generic Signal Item Solar Power Assembly 11 Ea Generic Signal Item Wood Pedestal 660 Lf Generic Signal Item #4 Solid Bare Copper Grounding Conductor 1,675 Lf Generic Signal Item 3-Wire Copper Feeder Conductors 3,570 Lf Generic Signal Item 4-Wire Copper Feeder Conductors Culvert Items Lump Sum Ls Removal Of Existing Structure At Station ************ (30+13.47 -y115rev-) Lump Sum Ls Asbestos Assessment Lump Sum Ls Culvert Excavation, Sta ****** (18+22.67 -y5b-) Lump Sum Ls Culvert Excavation, Sta ****** (19+75.11 -y5b-) Lump Sum Ls Culvert Excavation, Sta ****** (30+13.47 -y115rev-) Lump Sum Ls Culvert Excavation, Sta ****** (35+53.70 -y15rpdrev-) Lump Sum Ls Culvert Excavation, Sta ****** (43+66.60 -y15flyca-) Lump Sum Ls Culvert Excavation, Sta ****** (768+62.23 -l-) Lump Sum Ls Culvert Excavation, Sta ****** (792+88.12 -l-) 5,970 Ton Foundation Conditioning Material, Box Culvert 4,604.7 Cy Class a Concrete (Culvert) 799,380 Lb Reinforcing Steel (Culvert) 15 Ton Rip Rap, Class ** (a) 15 Ton Rip Rap, Class b 1,970 Sy Geotextile For Drainage Wall Items 4,090 Sf Mse Retaining Wall No **** (1) 3,250 Sf Mse Retaining Wall No **** (2) 555,368 Sf Generic Retaining Wall Item Architectural Surface Treatment 56,818 Sf Generic Retaining Wall Item Sound Barrier Wall 1 85,427 Sf Generic Retaining Wall Item Sound Barrier Wall 2 87,297 Sf Generic Retaining Wall Item Sound Barrier Wall 3 108,020 Sf Generic Retaining Wall Item Sound Barrier Wall 4 Structure Items Lump Sum Ls Foundation Excavation For Bent ** At Station ************ (1, 22+26.35 -y1b-) Lump Sum Ls Foundation Excavation For Bent ** At Station ************ (1, 58+33.94 -y15flyca-) Lump Sum Ls Foundation Excavation For Bent ** At Station ************ (1, 60+66.06 -y15flyac-) Lump Sum Ls Foundation Excavation For Bent ** At Station ************ (2, 47+63.62 -y15flybd-) Lump Sum Ls Foundation Excavation For Bent ** At Station ************ (2, 60+66.06 -y15flyac-) Lump Sum Ls Foundation Excavation For Bent ** At Station ************ (3, 47+63.62 -y15flybd-) Lump Sum Ls Foundation Excavation For Bent ** At Station ************ (3, 58+33.94 -y15flyca-) Lump Sum Ls Foundation Excavation For Bent ** At Station ************ (3, 60+66.06 -y15flyac-) Lump Sum Ls Foundation Excavation For Bent ** At Station ************ (4, 47+63.62 -y15flybd-) Lump Sum Ls Foundation Excavation For Bent ** At Station ************ (4, 58+33.94 -y15flyca-) Lump Sum Ls Foundation Excavation For Bent ** At Station ************ (4, 60+66.06 -y15flyac-) Lump Sum Ls Foundation Excavation For Bent ** At Station ************ (5, 47+63.62 -y15flybd-) Lump Sum Ls Foundation Excavation For Bent ** At Station ************ (5, 58+33.94 -y15flyca-) Lump Sum Ls Foundation Excavation For Bent ** At Station ************ (5, 60+66.06 -y15flyac-) Lump Sum Ls Foundation Excavation For Bent ** At Station ************ (6, 47+63.62 -y15flybd-) Lump Sum Ls Foundation Excavation For Bent ** At Station ************ (6, 58+33.94 -y15flyca-) Lump Sum Ls Foundation Excavation For Bent ** At Station ************ (6, 60+66.06 -y15flyac-) Lump Sum Ls Foundation Excavation For Bent ** At Station ************ (7, 58+33.94 -y15flyca-) Lump Sum Ls Foundation Excavation For Bent ** At Station ************ (8, 60+66.06 -y15flyac-) Lump Sum Ls Foundation Excavation For Bent ** At Station ************ (9, 60+66.06-y15flyac-) 115 Lf Pile Excavation In Soil 185 Lf Pile Excavation Not In Soil 56 Lf **'-**" Dia Drilled Piers In Soil (4'-6") 47 Lf **'-**" Dia Drilled Piers In Soil (6'-0") 98.5 Lf 4'-0" Dia Drilled Piers In Soil 56 Lf **'-**" Dia Drilled Piers Not In Soil (4'-6") 140 Lf **'-**" Dia Drilled Piers Not In Soil (5'-6") 212 Lf 4'-0" Dia Drilled Piers Not In Soil 2 Ea Pda Testing 5 Ea Sid Inspections 8 Ea Spt Testing 4 Ea Csl Testing 294,675 Sf Reinforced Concrete Deck Slab 268,594 Sf Grooving Bridge Floors 9,485.3 Cy Class Aa Concrete (Bridge) 2,195.6 Cy Class a Concrete (Bridge) Lump Sum Ls Bridge Approach Slabs, Station ************ (22+26.35 -y1b-) Lump Sum Ls Bridge Approach Slabs, Station ************ (23+43.03 -y16-) Lump Sum Ls Bridge Approach Slabs, Station ************ (30+67.66 -y4-) Lump Sum Ls Bridge Approach Slabs, Station ************ (47+28.33 -y15rev-) Lump Sum Ls Bridge Approach Slabs, Station ************ (47+63.62 -y15flybd-) Lump Sum Ls Bridge Approach Slabs, Station ************ (58+33.94 -y15flyca-) Lump Sum Ls Bridge Approach Slabs, Station ************ (60+66.06 -y15flyac-) 2,090,775 Lb Reinforcing Steel (Bridge) 29,987 Lb Spiral Column Reinforcing Steel (Bridge) 1,763.7 Lf 54" Prestressed Concrete Girders 11,906,699 Ls Approx ........ Lbs Structural Steel 114 Ea Pile Driving Equipment Setup For *** Steel Piles (Hp 12 x 53) 805 Ea Pile Driving Equipment Setup For *** Steel Piles (Hp 14 x 73) 4,420 Lf Hp12x53 Steel Piles 40,416 Lf Hp14x73 Steel Piles 39 Ea Steel Pile Points 96 Lf Predrilling For Piles 1,617.2 Lf Two Bar Metal Rail 10,618.7 Lf Concrete Barrier Rail 423.5 Lf Vertical Concrete Barrier Rail 309.7 Lf Concrete Median Barrier 354.1 Lf 1'-**"x *****" Concrete Parapet (1'-2" x 2'-3 1/2") 832.98 Lf 1'-**"x *****" Concrete Parapet (1'-2" x 2'-6") 481.4 Lf 1'-**"x *****" Concrete Parapet (1'-2" x 3'-3 3/4") 4,824.2 Sy 4" Slope Protection Lump Sum Ls Disc Bearings Lump Sum Ls Elastomeric Bearings Lump Sum Ls Expansion Joint Seals Lump Sum Ls Modular Expansion Joint Seals Lump Sum Ls Generic Structure Item Post Tensioning Encasement Lump Sum Ls Generic Structure Item Post Tensioning Tendons 4,566.33 Lf Generic Structure Item 63" Prestressed Concrete Florida i-Beam Girders 95.2 Cy Generic Structure Item 6000 Psi Concrete 196 Ea Generic Structure Item 9-5/8" Dia Micropiles 1 Ea Generic Structure Item Demonstration Micropiles 8 Ea Generic Structure Item Micropile Proof Tests 1 Ea Generic Structure Item Micropile Verification Tests

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents