Similar Projects
CTIHB Humanities Student Success Hub
Demolition, New Construction, Renovation, Infrastructure - 4,587 SF
Bidding
$470,000 CJ est. value
Salt Lake City, UT 84111

Winchester Waterline Trax to State Street
Infrastructure
Bidding
$1,600,000 CJ est. value
Murray, UT 84123

Herriman City Detention Basins
Infrastructure
Sub-Bidding
$700,000 CJ est. value
Herriman, UT 84096

Replacement of Microversa MVT Trip Units on Breakers in Substation
Infrastructure
Sub-Bidding
$400,000 CJ est. value
West Jordan, UT 84088

Grasmere Park Site Improvement Project
Infrastructure
Post-Bid
West Valley City, UT 84119

Juniper Canyon Recreation Area (JCRA) Eastern Trailhead
Infrastructure
Post-Bid
Herriman, UT

Reclamation Construction for Overland 2 Project
Results
Less than $350,000 est. value
Salt Lake City, UT

Delong Street And Parks and Public Lands Storage Yard Improvements
Results
Salt Lake City, UT

Paxton East Parking Lot
New Construction
Construction
$50,000 est. value
Salt Lake City, UT 84101

Costco
New Construction
Construction
Riverton, UT 84065

Eagle Eye Promotions
New Construction, Infrastructure - 21,110 SF
Pending Verification
$2,800,000 CJ est. value
West Jordan, UT 84088

Dalfen Industrial Park
New Construction, Infrastructure - 448,958 SF
Pending Verification
$50,000,000 CJ est. value
West Jordan, UT 84006

RFQ Engineering - Professional Engineering Services to the South Valley Water Reclamation Facility
Renovation, Infrastructure
Bidding
$500,000 CJ est. value
West Jordan, UT 84084

Rocky Ridge Park Site Improvement Project
Term Contract
Post-Bid
$850,000 est. value
West Valley City, UT 84118

Site Improvements at Taylorsville High School for Relocatable Classroom Buildings
Infrastructure
Results
Taylorsville, UT 84123

Last Updated 07/25/2022 12:04 PM
Project Title

Mountain America Redevelopment

Physical Address View project details and contacts
City, State (County) West Jordan, UT 84084   (Salt Lake County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Shopping Center/Strip Mall, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for redeveloping a former bank branch. As of July 25, 2022, this project is pending rezoning approval from the city council. A timeline has not been established and scope will depend on tenant interest and plans. *Absolutely no inquiries will be accepted at this time. Unsolicited inquiries may result in disqualification in any future bidding opportunities.

Details

Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents