Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

Briar Creek Boro to Berwick Boro line
Infrastructure
Bidding
$2,500,000 CJ est. value
Main Township, PA 17815

Briar Creek Boro to Berwick Boro line
Infrastructure
Bidding
$2,500,000 CJ est. value
Main Township, PA 17815

Belles Road Project
Infrastructure
Post-Bid
Orangeville, PA 17859

6,300L.F Pavement Base Drain, W/Geotextile Installed
Infrastructure
Post-Bid
Benton, PA

Plum Street Improvements Phase 7
Infrastructure
Results
$50,000 est. value

SR 339 From Smith Hollow Rd to Nescopeck Boro
Infrastructure
Results
$10,000,000 to $12,499,999 est. value
Nescopeck, PA 18635

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

SR 1003 - Brady Twp Line to SR 1001
Infrastructure
Design
$2,899,132 CJ est. value
Henderson Township, PA 16652

Honeysuckle Lane Stormwater Mitigation Project
Infrastructure
Bidding
$60,000 CJ est. value
Bloomsburg, PA 17815

1,278 Ton Superpave Scratch and Leveling Course
Infrastructure
Post-Bid
Benton, PA

East Seda-Cog Bridge Epoxy Ovelay
New Construction, Infrastructure
Results
$500,000 to $999,999 est. value
PA

Last Updated 03/16/2023 01:34 AM
Project Title

Substructure Contract

Physical Address View project details and contacts
City, State (County) Bloomsburg, PA 17815   (Columbia County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected November 2024
Bids Due View project details and contacts
Estimated Value $1,350,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Four bridges in Catawissa, Rockefeller, Kelly, AND Limestone (Twps). As of March 16, 2023, the project is in development stage. Anticipated letting date is September 01, 2024. PennDOT - Substructure Contract *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents